36th Street Trail
Greenway in Nebraska · OpenStreetMap relation
Runs through Bellevue · Sarpy County
Conditions now
Loading the weather near Bellevue…
Forecast by the National Weather Service for Bellevue · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Amerado Boulevard mile 0.2 directions to trailhead 1
- Parking at Sierra Lane mile 0.3 directions to trailhead 2
- Parking at 35th Street mile 0.3 directions to trailhead 3
- Parking at 35th Street mile 0.3 directions to trailhead 4
- Parking at South 36th Street mile 0.4 directions to trailhead 5
- Parking at Montrovia Boulevard mile 0.4 directions to trailhead 6
- Parking at 35th Street mile 0.4 directions to trailhead 7
- Parking at Sheridan Road mile 1.7 directions to trailhead 8
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The 36th Street Trail is a concrete path of about 1.8 miles along South 36th Street in Bellevue, Sarpy County, Nebraska. OpenStreetMap maps it as a bicycle route starting at Bline Avenue, with segments about 10 feet wide, designated for bicycles and pedestrians. The segments carry the web address of the City of Bellevue's 36th Street improvement project, whose Phase 1 covers Bline Avenue to Sheridan Road, with construction set to begin in October 2020 and completion anticipated in 2022.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Gretna 4ne, 19.3 km from the trail's middle, 43 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 37 50 62 72 83 86 84 77 64 49 36 Low °F 14 18 28 38 51 62 66 64 54 42 29 19 Precipitation, in 0.9 1.2 1.9 3.3 5 5.4 3.5 3.8 2.9 2.6 1.4 1.4 Snow, in 8.6 10.9 5.4 1 0.2 0 0 0 0 1.2 1.3 7.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Omaha sheet (1:250,000); the 1956 Plattsmouth sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Daniel Trail 0.6 mi away · 2.2 mi, paved
- Keystone Trail 0.7 mi away · 28.0 mi, paved
- West Papio Creek Trail 1.0 mi away · 17.7 mi, paved
- Harrison Street Trail 4.2 mi away · 3.5 mi, paved
- Big Papio Trail 4.4 mi away · 9.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17205657, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- OpenStreetMap relation 17205657, 36th Street Trail · web · checked Oct 18, 2026 Supports: name, bicycle route starting at Bline Avenue, concrete surface, width, bicycle designated, project website tag
- Phase 1 - 36th Street Improvements, Bellevue · web · checked Oct 18, 2026 Supports: Phase 1 limits (Bline Avenue to Sheridan Road), construction start October 2020, completion anticipated 2022
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.