36th Street Trail

Greenway in Nebraska · OpenStreetMap relation

Runs through Bellevue · Sarpy County

Conditions now

Loading the weather near Bellevue…

Forecast by the National Weather Service for Bellevue · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 2.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Amerado Boulevard mile 0.2 directions to trailhead 1
  2. Parking at Sierra Lane mile 0.3 directions to trailhead 2
  3. Parking at 35th Street mile 0.3 directions to trailhead 3
  4. Parking at 35th Street mile 0.3 directions to trailhead 4
  5. Parking at South 36th Street mile 0.4 directions to trailhead 5
  6. Parking at Montrovia Boulevard mile 0.4 directions to trailhead 6
  7. Parking at 35th Street mile 0.4 directions to trailhead 7
  8. Parking at Sheridan Road mile 1.7 directions to trailhead 8
36th Street Trail drawn on the 1954 USGS topographic map of Omaha, Nebraska
Then: the 1954 USGS Omaha sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The 36th Street Trail is a concrete path of about 1.8 miles along South 36th Street in Bellevue, Sarpy County, Nebraska. OpenStreetMap maps it as a bicycle route starting at Bline Avenue, with segments about 10 feet wide, designated for bicycles and pedestrians. The segments carry the web address of the City of Bellevue's 36th Street improvement project, whose Phase 1 covers Bline Avenue to Sheridan Road, with construction set to begin in October 2020 and completion anticipated in 2022.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gretna 4ne, 19.3 km from the trail's middle, 43 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323750627283868477644936
Low °F141828385162666454422919
Precipitation, in0.91.21.93.355.43.53.82.92.61.41.4
Snow, in8.610.95.410.200001.21.37.8
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Omaha sheet (1:250,000); the 1956 Plattsmouth sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17205657, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. OpenStreetMap relation 17205657, 36th Street Trail · web · checked Oct 18, 2026
    Supports: name, bicycle route starting at Bline Avenue, concrete surface, width, bicycle designated, project website tag
  3. Phase 1 - 36th Street Improvements, Bellevue · web · checked Oct 18, 2026
    Supports: Phase 1 limits (Bline Avenue to Sheridan Road), construction start October 2020, completion anticipated 2022

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.