Abbott Multi-use Trail
Greenway in Alaska
Runs through Anchorage · Anchorage Municipality
Conditions now
Loading the weather near Anchorage…
Forecast by the National Weather Service for Anchorage · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Hillside Park Trailhead mile 1 directions to Hillside Park Trailhead
- Parking at Hilltop Ski Area mile 1.4 directions to trailhead 2
- Hillside Park Trailhead mile 1.5 directions to Hillside Park Trailhead
- Parking at Hilltop Ski Area mile 1.5 directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Abbott Multi-use Trail is a roughly 1.6-mile path in the Hillside trail network of Anchorage, Alaska, in the area around Hillside Park, Service High School and Hilltop Ski Area. The name comes from OpenStreetMap, which tags the segments as cycleways open to bicycles and pedestrians, closed to motor vehicles, and groomed as a Nordic ski trail in winter. No manager page naming the trail was found.
OpenStreetMap records the trail as about 10 feet wide, with a dirt surface on the segments near Hillside Park and Hilltop Ski Area and asphalt on a separate segment farther west. Hillside Park trailheads with parking are mapped at the Hilltop Ski Area end.
The Municipality of Anchorage Parks and Recreation describes new singletrack being built by Singletrack Advocates between Service High School and Hilltop Ski Area, within the existing Nordic loops. A lower loop of about 3 miles between Service and the Abbott Road parking was completed in 2024, with an upper loop and an Abbott-to-Hilltop connector planned. That page does not name the Abbott Multi-use Trail, so it is cited only for the surrounding trail network.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Ft Richardson Wtp, 11.6 km from the trail's middle, 9 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 21 28 33 46 57 64 66 64 55 42 28 24 Low °F 8 12 15 28 38 46 50 48 40 28 15 11 Precipitation, in 0.6 0.9 0.7 0.4 0.7 1.1 2 2.5 2.7 1.7 1.2 1.4 Snow, in 9.8 10.3 10.7 1.5 0.4 0 0 0 0.1 4.4 9 13.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1951 Anchorage sheet (1:250,000); the 1953 Anchorage A-8 sheet (1:63,360) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Viewpoint Trail 0.8 mi away · 1.7 mi, dirt
- Old Rondy Trail 1.7 mi away · 1.9 mi, gravel
- Campbell Creek Trail 2.6 mi away · 7.6 mi, paved
- Chester Creek Connector 2.9 mi away · 2.0 mi, paved
- A/C St shared use path 3.6 mi away · 6.9 mi, paved
- Chester Creek Trail 4.0 mi away · 4.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Biking on a singletrack trail - Anchorage Parks and Recreation (muni.org) · organization · checked Oct 17, 2026 Supports: Singletrack Advocates trails between Service High School and Hilltop Ski Area, within Nordic loops, 3-mile lower loop completed 2024, upper loop and Abbott-to-Hilltop connector planned
- OpenStreetMap way 64625743 · web · checked Oct 17, 2026 Supports: name, cycleway, bicycle and foot designated, no motor vehicles, Nordic piste grooming, dirt surface, 10 ft width
- OpenStreetMap way 71339890 · web · checked Oct 17, 2026 Supports: asphalt segment, Hillside network tag
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.