States › New York

Adirondack Rail Trail

Rail-trail in New York

Runs through Village of Tupper Lake, Town of Tupper Lake, Santa Clara, Harrietstown, Saranac Lake, North Elba and Lake Placid · Franklin and Essex counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
33.7 mi 54.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Trailhead at Station Street mile 0 directions to trailhead 1
  2. Oseetah Trails Parking Area mile 7.5 directions to Oseetah Trails Parking Area
  3. Parking at South Street mile 8.5 directions to trailhead 3
  4. Parking at Pine Street mile 9.4 directions to trailhead 4
  5. Parking at Broadway Street mile 10.1 directions to trailhead 5
  6. Parking at Broadway Street mile 10.1 directions to trailhead 6
  7. Parking at Station Road mile 19 directions to trailhead 7
  8. Trailhead mile 19.7 directions to trailhead 8
  9. Parking at Flood Wood Road mile 25.4 directions to trailhead 9
  10. Parking at Washington Street mile 33.4 directions to trailhead 10
  11. Parking at Washington Street mile 33.7 directions to trailhead 11
Adirondack Rail Trail (opens in a new tab)
Photo: rdelach · CC BY-SA 4.0 · Mapillary

About this trail

The Adirondack Rail Trail is a 34-mile multi-use trail in the Adirondack Park of New York, running from Station Street in Lake Placid through Ray Brook, Saranac Lake and Lake Clear to the Tupper Lake depot on Depot Street. The New York State Department of Environmental Conservation (DEC) manages it under a 2020 amendment to the Remsen–Lake Placid Travel Corridor unit management plan, with the nonprofit Adirondack Rail Trail Association helping with maintenance and amenities. The corridor was part of the Mohawk and Malone Railway, founded by William Seward Webb, later the New York Central's Adirondack Division. DEC dates the line to 1892 and its operation to 1972; the state bought the line and right-of-way in 1974.

In 2020 the state legislature amended the Adirondack Park Act to allow the tracks between Tupper Lake and Lake Placid to be removed, and the Department of Transportation took them up between October 2020 and November 2021. Jurisdiction passed to DEC in spring 2022, and the Office of General Services built the trail in three phases: Lake Placid to Saranac Lake from fall 2022 to December 2023, Saranac Lake to Floodwood Road through August 2024, and Floodwood Road to Tupper Lake from August 2024. Governor Kathy Hochul announced the final phase complete on October 6, 2025; the project cost almost $40 million. South of Tupper Lake the corridor remains a railroad used by the Adirondack Railroad.

The surface is crushed and compacted stone, paved through the Saranac Lake area, with a typical grade of 2 percent. DEC trailheads include Ray Brook Road, Fowler's Crossing on State Route 86, the Union Depot in Saranac Lake, McMaster's Crossing in Lake Clear, Station Road in Santa Clara, Floodwood Road and Washington Street in Tupper Lake. The trail is free and open year-round to walkers, bicyclists and class 1 e-bikes; snowmobiles, cross-country skiers, fat-tire bikes and snowshoers use it in winter, and horses are not allowed.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 31% of this route as a trail on former railroad right-of-way.

Lake Placid Branch and DH Chateaugay Branch (Penn Central Transportation Co. / Delaware & Hudson). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Saranac Regional Airport, 5.2 km from the trail's middle, 13 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F252836506472777568544230
Low °F2312263646514941322211
Precipitation, in1.91.523.13.74.44.13.63.53.92.82.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Saint Regis sheet (1:62,500); the 1955 Saint Regis sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Saranac Lake, c. 1905–1920: Central station, Adirondacks
Saranac Lake, c. 1905–1920: Central station, AdirondacksPhoto: Detroit Publishing Co. · No known restrictions · Library of Congress, Prints & Photographs Division (opens in a new tab)

Community

What riders say on Reddit

2 Reddit threads about this trail, Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Adirondack Rail Trail (opens in a new tab)
  1. 360° view 1 of 6, photo by rdelach
  2. 360° view 2 of 6, photo by rdelach
  3. 360° view 3 of 6, photo by rdelach
  4. 360° view 4 of 6, photo by rdelach
  5. 360° view 5 of 6, photo by rdelach
  6. 360° view 6 of 6, photo by rdelach
360° panorama · Photo: rdelach · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Adirondack Rail Trail — NYS Department of Environmental Conservation · government source · checked Oct 13, 2026
    Supports: 34 miles; Station Street, Lake Placid to Tupper Lake Depot, 37 Depot Street; communities; 2020 UMP amendment; spring 2022 transfer to DEC; DEC and OGS construction; built 1892, operated until 1972, state purchase 1974; phase dates; surface, pavement in Saranac Lake, 2% grade; trailheads; year-round and winter uses; class 1 e-bikes; equestrian use prohibited; free
  3. Governor Hochul Announces Completion of Recreation and Transportation Projects — NY Regional Economic Development Councils (October 6, 2025) · government source · checked Oct 13, 2026
    Supports: final phase complete and trail open year-round; almost $40 million; OGS led design and construction in three phases; NYSDOT rail removal from October 2020; March 2022 transfer to DEC; Adirondack Rail Trail Association stewardship agreement; Adirondack Railroad service to Tupper Lake
  4. Adirondack Division — Wikipedia · organization · checked Oct 13, 2026
    Supports: Mohawk and Malone Railway founded by William Seward Webb, New York Central Adirondack Division; 2020 Adirondack Park Act amendment; track removal October 2020 to November 2021
  5. The Adirondack Rail Trail — Adirondack Rail Trail Association · organization · checked Oct 13, 2026
    Supports: nonprofit partner of DEC for maintenance and amenities

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.