Alabaster Bike Path
Greenway in Michigan · OpenStreetMap relation
Runs through East Tawas, Tawas City and Alabaster Township · Iosco County
Conditions now
Loading the weather near Tawas City…
Forecast by the National Weather Service for Tawas City · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Court Street mile 0.8 directions to trailhead 1
- Parking at Court Street mile 1.1 · restrooms directions to trailhead 2
- Dyer Road Trailhead mile 9.4 directions to Dyer Road Trailhead
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Alabaster Bike Path, as OpenStreetMap names it, is the southern part of the paved pathway along US 23 and the shore of Tawas Bay in Iosco County, Michigan, which links Alabaster Township, Tawas City, East Tawas and Baldwin Township. TrailLink lists the whole path as the Tawas Bay Pedestrian and Bike Path, 13.9 miles from Dyer Road to Tawas Point State Park. The Michigan Department of Natural Resources' Iron Belle Trail map for the Au Gres to Sunrise Side Pathway segment on US 23 labels the stretch from the Arenac–Iosco county line to Whittemore Road as the Sunrise Side Pathway – Alabaster Trail, and the stretch from Whittemore Road to Tawas Beach Road as the Sunrise Side Pathway – Tawas Bay Trail.
The path is mapped here as about 7.1 miles in two pieces, from the Dyer Road trailhead northeast to Court Street in Tawas City. The rest of the route, through Tawas City and East Tawas to Tawas Point State Park, is listed separately as the Tawas Bay Bike Trail. TrailLink describes the southwestern portion as an off-road trail through an arboretum, becoming busier toward Tawas City. A Fastest Known Time route description calls this stretch the Alabaster Arboretum, a 6.5-mile asphalt trail with more than 150 labeled trees along its edge and a view of an old offshore loading facility; the same description notes that alabaster is another word for gypsum, which is still mined in the area.
TrailLink lists the surface as asphalt and concrete, with uses including biking, inline skating, walking and cross-country skiing, and parking in Tawas City at Gateway Park and City Park along US 23. An August 2026 TrailLink review describes the Alabaster section as smooth pavement set back from the road with good signs, in contrast to older sidewalk farther north.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
E Tawas, 8.7 km from the trail's middle, 13 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 32 41 52 65 75 80 79 72 59 46 35 Low °F 13 13 21 32 44 53 58 57 49 38 29 20 Precipitation, in 2.1 1.8 1.9 3.4 3.2 3.3 3.1 3 2.9 3 2.5 2.1 Snow, in 14.3 12.4 7.2 2.9 0 0 0 0 0 0.1 2.6 9.7 - On the National Register
- Alabaster Historic District, Alabaster · historic district, listed 1977 · nomination file for Alabaster Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1954 Tawas City sheet (1:250,000); the 1966 Alabaster sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Tawas Bay Bike Trail within 0.2 mi · 3.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9768228, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan's Iron Belle Trail: Au Gres – Sunrise Side Pathway on US-23 (map) — Michigan DNR · government source · checked Oct 15, 2026 Supports: Iron Belle Trail route along US 23; section names Sunrise Side Pathway – Alabaster Trail (Arenac/Iosco county line to Whittemore Road) and Sunrise Side Pathway – Tawas Bay Trail (Whittemore Road to Tawas Beach Road)
- Tawas Bay Pedestrian and Bike Path — TrailLink · web · checked Oct 15, 2026 Supports: 13.9 miles from Dyer Road to Tawas Point State Park, communities linked, route along US 23 and Tawas Bay, off-road arboretum section in the southwest, asphalt and concrete surface, activities, parking at Gateway Park and City Park in Tawas City, August 2026 review
- Route: Tawas Bay Pathway + Alabaster Arboretum (MI) — Fastest Known Time · web · checked Oct 15, 2026 Supports: Alabaster Arboretum name, 6.5-mile asphalt section, more than 150 labeled trees, old offshore loading facility, alabaster as a word for gypsum
- Alabaster Bike Path — OpenStreetMap relation 9768228 · web · checked Oct 15, 2026 Supports: name, mapped length in two pieces, Dyer Road trailhead and Court Street ends
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.