States › New Mexico

Alameda Drain Trail

Greenway in New Mexico

Runs through North Valley, Los Ranchos de Albuquerque and Albuquerque · Bernalillo County

Conditions now

Loading the weather near Albuquerque…

Forecast by the National Weather Service for Albuquerque · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.7 mi 9.2 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Matthew Avenue Northwest mile 1 directions to trailhead 1
  2. Parking at Matthew Avenue Northwest mile 1 directions to trailhead 2
  3. Parking at Matthew Avenue Northwest mile 1.1 directions to trailhead 3
  4. Parking at Mildred Avenue Northwest mile 1.2 directions to trailhead 4
  5. Parking at Mildred Avenue Northwest mile 1.3 directions to trailhead 5
  6. Parking at Mildred Avenue Northwest mile 1.5 directions to trailhead 6
  7. Parking at Shropshire Place Northwest mile 1.6 directions to trailhead 7
  8. Parking at Griegos Road Northwest mile 2.4 directions to trailhead 8
  9. Parking at Calle de la Luz Northwest mile 2.4 directions to trailhead 9
  10. Parking at 2nd Street Northwest mile 4.1 directions to trailhead 10
Los Tomases Chapel, beside the trail (opens in a new tab)
Los Tomases Chapel, beside the trail · Photo: Roland Penttila · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Alameda Drain Trail is a paved multi-use path along the Alameda Drain in Albuquerque and Bernalillo County, New Mexico. A nine-mile corridor from Interstate 40 to the northern end of 2nd Street is planned under a five-party agreement among Bernalillo County, the City of Albuquerque, the Middle Rio Grande Conservancy District (MRGCD), the Albuquerque Metropolitan Flood Control Authority and the New Mexico Department of Transportation. Parametrix, an engineering firm, was selected in 2015 and designed four of the six phases.

According to a December 2023 Parametrix article, three phases of construction were complete by then, including 4.5 miles of trail from 4th Street to Paseo del Norte. The typical section is a twelve-foot paved trail with two-foot shoulders, and a secondary unpaved trail is proposed in places on the opposite side of the drain. Biketherail.org's record lists 5.7 miles.

The City of Albuquerque's Parks and Recreation page for the trail describes an 8 to 12 foot wide asphalt surface and a new multi-purpose bicycle path, reached across bridges near Garfield Park or Matthew Meadows Park; it lists no public facilities and says the street crossings are not pedestrian friendly. MRGCD's board delegated authority over e-bikes on the Alameda Drain paved trail to the City of Albuquerque and Bernalillo County, and the page states the City has said it will allow e-bikes.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Petroglyph Natl Mon, 6.7 km from the trail's middle, 44 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505665728192939084725949
Low °F242834415060656356433224
Precipitation, in0.60.40.70.50.40.31.51.61.60.90.60.6
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Bernalillo sheet (1:125,000); the 1954 Los Griegos sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Alameda Drain Trail - City of Albuquerque Parks and Recreation · government source · checked Oct 17, 2026
    Supports: 8-12 foot asphalt, bicycle path, access near Garfield Park and Matthew Meadows Park, no facilities, crossings
  3. Alameda Drain Trail Enhances Historic Drainage Way in New Mexico - Parametrix · web · checked Oct 17, 2026
    Supports: nine-mile corridor, five-party agreement, 2015 selection, phases, 4.5 miles built from 4th Street to Paseo del Norte, paved section
  4. MRGCD Board of Directors Amends E-Bike Resolution - MRGCD · web · checked Oct 17, 2026
    Supports: e-bike authority delegated to City and County; City will allow e-bikes

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.