States › Texas

Alazan Creek Greenway Trail

Greenway in Texas · OpenStreetMap relation

Runs through San Antonio · Bexar County

Conditions now

Loading the weather near San Antonio…

Forecast by the National Weather Service for San Antonio · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Leal Street mile 0.6 · restrooms · water directions to trailhead 1
  2. Parking at Texas Avenue mile 2 directions to trailhead 2
  3. Parking at Cincinnati Avenue mile 2 directions to trailhead 3
Basilica of the National Shrine of the Little Flower, beside the trail (opens in a new tab)
Basilica of the National Shrine of the Little Flower, beside the trail · Photo: Zereshk · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Alazan Creek Greenway Trail, opened as the Alazán Creek Linear Trail, is a paved trail along Alazan Creek on the West Side of San Antonio, Texas, and part of the city's Howard W. Peak Greenway Trails System. Alazán is one of four West Side creeks, with Apache, Martinez and San Pedro creeks, in the San Antonio River Authority's Westside Creeks Project, which aims to restore 14 miles of creekways. It is a creek greenway, not a rail-trail.

Construction began with a groundbreaking in April 2015 on a first section of about half a mile: a 10-foot paved path from near Woodlawn Lake on Texas Avenue to Lombrano Street, a $1.2 million City of San Antonio project described as the first stage of seven miles of connected West Side trails. It opened in June 2016. In 2018 the river authority registered a $6 million project with the Texas Department of Licensing and Regulation to build about 3 miles of concrete trail and street connections from Lombrano Street to the confluence, scheduled for December 2018 to January 2020, and a separate $2.5 million package of trailheads, parking areas and trees along the trail, scheduled through December 2021; both filings are now marked closed.

This record maps about 2 miles, from Texas Avenue south past Lombrano Street to West Travis Street. OpenStreetMap shows the trail continuing about 1.3 miles farther south to the Apache Creek Greenway Trail near the mouth of Alazan Creek, a stretch not on this record's map line. OpenStreetMap tags the path as 10-foot concrete for bicycles and pedestrians. TrailLink lists parking at the northern end, at Alexander and Texas avenues; the record also shows parking off Leal Street, with water and restrooms, and off Cincinnati Avenue.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
San Antonio Incarnate Word, 6.2 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F636874808692949590827164
Low °F404451576672747469594941
Precipitation, in2.21.92.42.34.43.52.42.43.93.92.52.1
Snow, in000000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1953 San Antonio West sheet (1:24,000); the 1967 San Antonio West sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14296666, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Project EABPRJB8821033, Westside Creeks - Alazan Creek Trail — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: 2018 registration by the San Antonio River Authority; about 3 miles of concrete trail and street connections from Lombrano Street to the confluence; estimated $6 million; scheduled December 2018 to January 2020; project closed
  3. Project EABPRJB8821034, Westside Creeks-Alazan Creek Enhancement — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: trailheads, parking areas, tree packages and enhancements along the Alazan Creek Trail; estimated $2.5 million; scheduled June 2019 to December 2021
  4. Westside Welcomes Alazán Trail Improvements — San Antonio Report · organization · checked Oct 15, 2026
    Supports: name Alazán Creek Linear Trail; part of the Howard W. Peak Greenway Trails System; one of four West Side creeks (Alazán, Apache, Martinez, San Pedro) in the San Antonio River Authority's Westside Creeks Project; goal of restoring 14 miles of creekways
  5. Construction to begin on Alazan Creek trail — KSAT (April 7, 2015) · web · checked Oct 15, 2026
    Supports: April 2015 groundbreaking; $1.2 million City of San Antonio investment expanding the Howard W. Peak Greenway Trails System; 10-foot paved path from near Woodlawn Lake on Texas Avenue to Lombrano Street; about half a mile; first stage of seven miles of connecting West Side trails
  6. SA's newest hike and biking trail officially opens — KSAT (June 19, 2016) · web · checked Oct 15, 2026
    Supports: grand opening of the Alazan Creek Linear Trail in June 2016; 10-foot paved path for walkers, runners and cyclists from near Woodlawn Lake on Texas Avenue to Lombrano Street
  7. Alazan Creek Greenway Trail — TrailLink · web · checked Oct 15, 2026
    Supports: parking at the northern end at Alexander Avenue and Texas Avenue
  8. Alazan Creek Greenway Trail — OpenStreetMap relation 14296666 (and way 1047322400) · web · checked Oct 15, 2026
    Supports: mapped length from Texas Avenue past Lombrano Street to West Travis Street; 1.3-mile continuation (way 1047322400) south to the Apache Creek Greenway Trail; 10-foot concrete, bicycle and foot designated; parking at Leal Street (water, restrooms) and Cincinnati Avenue

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.