Alex Laveau Memorial Trail
Rail-trail in Minnesota
Runs through Carlton and Twin Lakes Township (Carlton County) · Carlton County
Conditions now
Loading the weather near Carlton…
Forecast by the National Weather Service for Carlton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Alex Laveau State Trail, also listed as the Alex Laveau Memorial Trail, is a Minnesota state trail between Carlton, Wrenshall and the Wisconsin state line, managed by the Minnesota Department of Natural Resources. It honors a former county commissioner and dairy farmer who strongly advocated reusing abandoned railways as public trails. It is part of the Munger Trail System, which also includes the Gateway, Brown's Creek, Mondale, James L. Oberstar and Munger state trails. TrailLink classes it as a rail-trail.
The trail leaves the Munger State Trail at a junction in Carlton and runs 6.5 miles through Wrenshall to Highway 23 as paved off-road trail. In Wrenshall, according to TrailLink, the route follows County Route 1 to Parkwood Drive before turning onto the off-road trail. From Highway 23, bike routes on paved highway shoulders and city streets continue 9.5 miles to Gary-New Duluth, and a further 2 miles of gravel trail runs from Highway 23 to the Minnesota-Wisconsin border. The DNR counts about 16 miles from Gary-New Duluth through Wrenshall to Carlton. The country is hilly, with northern hardwoods, jack, red and white pine, spruce and fir, lakes and bogs.
The DNR lists the trail for hiking, biking, in-line skating, mountain biking, horseback riding and snowmobiling, and it is accessible, with electric wheelchairs allowed. Horseback riders and carriage drivers need a Horse Pass, and snowmobiles must be registered or carry a state trail sticker; no other fee or pass is needed. Parking is at 90 3rd Street in Carlton and at 400 Evergreen Drive in Wrenshall, which also has seasonal restrooms.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cloquet, 10.3 km from the trail's middle, 53 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 18 24 37 50 64 74 78 76 67 52 35 23 Low °F 2 5 16 28 38 48 54 53 46 34 22 9 Precipitation, in 1 1 1.4 2.4 3.5 4.8 4.3 4.2 3.6 3.3 1.8 1.5 Snow, in 13.5 13.5 10.3 6.4 0.3 0 0 0 0 1.8 9.6 15.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Duluth sheet (1:250,000); the 1954 Cloquet sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesAlex Laveau State Trail — Minnesota DNR
Nearby trails
- Munger State Trail within 0.2 mi · 74.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Alex Laveau State Trail | Minnesota DNR · government source · checked Oct 15, 2026 Supports: name, DNR management, namesake, Munger Trail System members, 6.5 miles from the Munger State Trail junction in Carlton through Wrenshall to Highway 23, 9.5 miles of shoulders and streets to Gary-New Duluth, 2 miles of gravel to the state line, 16 miles total, landscape, trail uses, Horse Pass and snowmobile rules, no other fees, parking and restrooms
- Alex Laveau Memorial Trail (Willard Munger State Trail) | Minnesota Trails | TrailLink · web · checked Oct 15, 2026 Supports: alternate name Alex Laveau Memorial Trail, rail-trail category, route in Wrenshall along Co Rt. 1 to Parkwood Dr.
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
