States › New Hampshire

Allenstown Rail Trail

Rail-trail in New Hampshire

Runs through Suncook and Allenstown · Merrimack County

Conditions now

Loading the weather near Suncook…

Forecast by the National Weather Service for Suncook · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Allenstown, along the trail (opens in a new tab)
Allenstown, along the trail · Photo: John Phelan · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Allenstown Rail Trail is a gravel path in Allenstown, New Hampshire, on a former rail bed of the Suncook Valley Railroad, running from Ferry Street near the village of Suncook to a connection with Hooksett's rail trail. The record maps about 0.7 mile; the Concord Monitor described it as about a mile long. The town's Highway Department built it over about a year and a half, and the town celebrated its completion in October 2024.

The Suncook Valley Railroad ran its first round trip between Suncook and Pittsfield on December 6, 1869, and was later extended to Center Barnstead. It was leased to the Concord Railroad and its successors, including the Boston and Maine from 1895, before operating independently from 1924. Its stub from Suncook to Hooksett was abandoned during the Second World War, and the last trip to Concord ran on December 20, 1952.

Building the trail involved clearing the overgrown bed, leveling it, laying stone and geotextile fabric topped with stone dust, and rebuilding three wooden bridges over drainage ditches with timber from former telephone poles given by an anonymous donor; Allenstown Aggregate donated the gravel and stone dust. The trailhead, with a parking lot, is at the corner of Ferry Street and Canal Street, within walking distance of downtown Suncook. The trail is used for walking, running and cycling, and the foundation of an old steam-engine water tower lies along it. The Central New Hampshire Regional Planning Commission includes the trail in its Suncook Valley Trails network, and town officials hope Pembroke will build its section so the route can continue toward Concord.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Concord - Montreal and Abandoned. From New Hampshire Railroads (NH GRANIT / NHDOT).

Shade

58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Concord Municipal Airport, 8.8 km from the trail's middle, 42 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323544586978838274614837
Low °F131523334454595749382920
Precipitation, in2.82.83.33.43.53.83.63.63.64.43.43.7
Snow, in17.116.913.62.5000000.82.514.3
Old maps

USGS topographic maps of the trail's middle go back to the 1921 Suncook sheet (1:62,500); the 1968 Manchester North sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Suncook Valley Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: first Suncook–Pittsfield round trip December 6, 1869, extension to Center Barnstead, leases to the Concord Railroad and the Boston and Maine (1895), independent operation from 1924, Suncook–Hooksett stub abandoned during World War II, last trip to Concord December 20, 1952
  3. A place to stroll: Allenstown celebrates completion of rail trail to Hooksett — Concord Monitor (October 22, 2024) · press · checked Oct 13, 2026
    Supports: about one mile, Suncook Valley Railroad bed, connection to Hooksett's rail trail, Highway Department project of about a year and a half, clearing, leveling, stone, geotextile and stone dust, three rebuilt bridges with donated telephone-pole timber, Allenstown Aggregate donation, Ferry and Canal Street trailhead and parking, uses including biking, water-tower foundation, Suncook Valley Trails network, Pembroke hopes

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.