States › Ohio

Alum Creek Trail

Greenway in Ohio · OpenStreetMap relation

Runs through Westerville, Columbus and Bexley · Franklin County

Conditions now

Loading the weather near Columbus…

Forecast by the National Weather Service for Columbus · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
23.0 mi 37.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Westerville Park & Ride mile 0 directions to Westerville Park & Ride
  2. Parking at West Main Street mile 0 directions to trailhead 2
  3. Parking at Collegeview Road mile 0.1 directions to trailhead 3
  4. Parking mile 2.5 directions to trailhead 4
  5. Cooper Park (Trailhead) mile 2.9 · water directions to Cooper Park (Trailhead)
  6. Parking at Westerville Crossing Drive mile 3.2 directions to trailhead 6
  7. James O Casto Park (Trailhead) mile 3.7 directions to James O Casto Park (Trailhead)
  8. Parking at East Dublin Granville Road mile 4 directions to trailhead 8
  9. Parking at East Dublin Granville Road mile 4.1 directions to trailhead 9
  10. Parking at Corporate Drive mile 4.2 directions to trailhead 10
  11. Parking at Corporate Drive mile 4.2 directions to trailhead 11
  12. North Parking Lot mile 6.3 directions to North Parking Lot
  13. Pathways Park (Trailhead) mile 6.3 directions to Pathways Park (Trailhead)
  14. South Parking Lot mile 6.8 · restrooms directions to South Parking Lot
  15. Parking mile 7.7 directions to trailhead 15
  16. Parking mile 7.7 directions to trailhead 16
  17. Parking at Ballyvaughn Drive mile 9.7 directions to trailhead 17
  18. Parking at Ballyvaughn Drive mile 9.7 directions to trailhead 18
  19. Alum Creek Trailhead mile 10.4 · restrooms directions to Alum Creek Trailhead
  20. Parking at Airport Drive mile 11.2 directions to trailhead 20
  21. Parking at Airport Drive mile 11.2 directions to trailhead 21
  22. Parking mile 11.2 directions to trailhead 22
  23. Parking mile 11.2 directions to trailhead 23
  24. Parking at Airport Drive mile 11.2 directions to trailhead 24
  25. Parking at Airport Drive mile 11.2 directions to trailhead 25
  26. Hayden Park mile 11.8 directions to Hayden Park
  27. Hayden Park (Trailhead) mile 11.8 directions to Hayden Park (Trailhead)
  28. Parking at North Nelson Road mile 13 directions to trailhead 28
  29. Parking at Clifton Avenue mile 13.2 directions to trailhead 29
  30. Parking at East Broad Street mile 13.3 directions to trailhead 30
  31. Parking at East Broad Street mile 13.4 directions to trailhead 31
  32. Parking at South Nelson Road mile 13.5 directions to trailhead 32
  33. Parking at Franklin Park South mile 13.8 directions to trailhead 33
  34. Parking at East Main Street mile 14.3 directions to trailhead 34
  35. Parking at Old Colony Lane mile 17 directions to trailhead 35
  36. Parking at Petzinger Road mile 17 directions to trailhead 36
  37. Parking at Petzinger Road mile 17 directions to trailhead 37
  38. Parking at Natchez Drive mile 17 directions to trailhead 38
  39. Parking at Three Creeks Park mile 20.3 · restrooms directions to trailhead 39
  40. Parking at Three Creeks Park mile 20.3 · restrooms directions to trailhead 40
  41. Madison Mills mile 20.7 directions to Madison Mills
  42. Parking at Three Creeks Park mile 22.2 · restrooms · water directions to trailhead 42
Alum Creek Trail (opens in a new tab)
Photo: pqse · CC BY-SA 4.0 · Mapillary

About this trail

The Alum Creek Trail is a paved greenway trail in central Ohio that runs south along Alum Creek from Westerville through Columbus to Three Creeks Metro Park. It is not a rail-trail. Metro Parks lists it at 24.5 miles and manages the 22-mile section from Interstate 270 in Westerville to the southern end at Three Creeks. The trail is part of the Ohio to Erie Trail, the off-road route between Cincinnati and Cleveland by way of Columbus.

The trail links more than 12 parks and seven neighborhoods in Columbus, Westerville, Bexley and Obetz. In July 2011 Columbus Mayor Michael Coleman dedicated a 2.5-mile section at Innis Park, then described as one of the final pieces of the trail; it includes an iron and steel truss bridge built in 1900 and moved from Wheelersburg. At the time Coleman named completion of the last two sections a priority of his administration.

Trailheads include Cooper Park and James O. Casto Park in the north, Pathways Park and Hayden Park in the middle, and Three Creeks in the south. At Nelson Road the Downtown Connector Trail joins, and at Three Creeks the Alum Creek Trail meets the Blacklick Creek Trail. The record here covers about 23 miles from West Main Street in Westerville to Three Creeks Metro Park.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Columbus Port Columbus International Airport, 4.8 km from the trail's middle, 13 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374151647482858478665242
Low °F222432425262656456453527
Precipitation, in32.43.63.944.34.73.73.12.92.83.1
Snow, in9.57.64.10.5000000.21.25.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1925 East Columbus sheet (1:62,500); the 1955 Southeast Columbus sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • In 2024 riders suggested Innis, Casto and Wolfe parks as places to park for the trail; one said cars can get locked in at the Pathways Park lot in the evening. r/Columbus, Mar 2024
  • In 2025 riders said fountains were scarce and mostly at park restrooms by the lots; a 2026 rider starting at Three Creeks reported fountains and restrooms along the way. r/Columbus, Jul 2025 · r/Columbus, Apr 2026
  • One rider in June 2024 found parts between 5th and Broad torn up with no marked detour; two riders in February 2025 said the Innis boardwalk repair closure had no good detour. r/Columbus, Jun 2024 · r/Columbus, Feb 2025
  • In 2025 riders suggested reaching the trail by a Johnstown Road spur and heading downtown on Bryden Road; a 2026 rider said the last stretch from Fort Hayes runs on streets or sidewalks. r/Columbus, Jun 2025 · r/Columbus, Mar 2026
24 Reddit threads about this trail, Mar 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2245700, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City Bike Trail Links Cross-State Off-Road Path — WOSU (2011-07-18) · organization · checked Oct 14, 2026
    Supports: 2.5-mile Innis Park section dedicated by Mayor Michael Coleman in July 2011, 1900 truss bridge moved from Wheelersburg, part of the Ohio to Erie Trail, Coleman's priority to finish the last two sections
  3. Greenway Trails — Metro Parks, Central Ohio Park System · web · checked Oct 14, 2026
    Supports: 24.5 miles, paved, Westerville to Three Creeks, Metro Parks manages 22-mile section south of I-270, meets Blacklick Creek Trail at Three Creeks, Downtown Connector Trail joins at Nelson Road
  4. Alum Creek Trail Dedication — The Righter Company (2011-07-15) · web · checked Oct 14, 2026
    Supports: Innis Park section one of the final pieces, more than 12 parks, 7 neighborhoods, Columbus, Westerville, Bexley and Obetz
  5. Alum Creek Trail — OpenStreetMap relation 2245700 · web · checked Oct 14, 2026
    Supports: trailhead names (Cooper Park, James O. Casto Park, Pathways Park, Hayden Park), record extent from West Main Street in Westerville

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.