States › Florida

Amelia Island Trail

Greenway in Florida

In Nassau County

Conditions now

Loading the weather near Jacksonville…

Forecast by the National Weather Service for Jacksonville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.0 mi 8.0 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Beach Lagoon Road mile 2.2 directions to trailhead 1
  2. Parking at First Coast Highway mile 2.4 directions to trailhead 2
  3. Parking at First Coast Highway mile 2.5 directions to trailhead 3
American Beach, near the trail (opens in a new tab)
American Beach, near the trail · Photo: NPS Photo/Charles Stankiewicz · Public domain (US Government) · National Park Service

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Amelia Island Trail is a paved asphalt shared-use path beside State Road A1A on Amelia Island in Nassau County, Florida, and part of the East Coast Greenway. Nassau County, working with the North Florida Transportation Planning Organization, is building a shared-use path network from the southern tip of the island to downtown Fernandina Beach that it describes as a transportation route for daily commuters as well as a leisure trail. The Amelia Island Trail is the network's planned 17-mile north-south spine.

The existing trail runs about 6 miles from Peters Point Park in Fernandina Beach, which has parking and restrooms, south to Amelia Island State Park. It follows A1A with wide medians and, in places, tree-lined buffers, and crosses the highway several times. The northern end is busier; the southern end runs past maritime forest. South of the state park the trail links to the Timucuan Trail across the A1A bridge over Nassau Sound. The line on this site covers about 5 miles of the southern part, from the Amelia City area to the state park.

In a 2021 request for $5.1 million in state funds, Nassau County described Phase 4 of the trail as the final 5 miles of the spine, to be designed and built to reach downtown Fernandina Beach, with about $17.6 million in total project costs, most of them federal. The trail has numerous driveway and road crossings, and A1A also carries a bike lane.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Fernandina Beach, 12.1 km from the trail's middle, 13 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F646772778488919086807266
Low °F454954606873757573655649
Precipitation, in3.23.13.332.76.156.47.251.93.1
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1919 Fernandina sheet (1:62,500); the 1958 Amelia City sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Local Funding Initiative Request FY 2022-2023, LFIR #1940: Amelia Island Trail Phase 4 - Nassau County — The Florida Senate · government source · checked Oct 16, 2026
    Supports: Nassau County with the NFTPO developing a shared-use path network from the southern tip of the island to downtown Fernandina Beach; not merely a leisure trail but a mobility system for daily commuters; AIT Phase 4 is the final 5 miles of the 17-mile north-south spine; $5,119,474 requested (request dated 12/03/2021); total project cost $17,598,964, 71% federal; design, construction and inspection of the final segment to downtown Fernandina Beach
  3. Amelia Island Trail — 100 Florida Trails · web · checked Oct 16, 2026
    Supports: paved asphalt trail parallel to A1A for 6 miles from Peters Point Park in Fernandina Beach to Amelia Island State Park; links south to the Timucuan Trail across the A1A bridge over Nassau Sound; part of the East Coast Greenway; wide medians and tree-lined buffers; crosses A1A a few times; numerous driveway and road crossings; busier northern end, southern end past maritime forest; Peters Point Park parking and restrooms; bike lane on A1A
  4. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: mapped line of about 5 miles from the Amelia City area south to Amelia Island State Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.