States › California

Antelope Creek Trail

Greenway in California

Runs through Roseville · Placer County

Conditions now

Loading the weather near Roseville…

Forecast by the National Weather Service for Roseville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Antelope Creek Trailhead mile 1.4 directions to Antelope Creek Trailhead
  2. Parking at Springview Drive mile 1.4 directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Antelope Creek Trail (opens in a new tab)
Photo: RosevilleCreeks2025 · CC BY-SA 4.0 · Mapillary

About this trail

The Antelope Creek Trail is a paved bicycle and pedestrian path along Antelope Creek in Roseville and Rocklin, in Placer County, California. The City of Roseville Public Works Department proposed it as the Antelope Creek Bicycle and Pedestrian Trail Project: 1.5 miles of shared bicycle path and pedestrian trail along the creek, from Galleria Boulevard to about the Roseville–Rocklin city line just north of State Route 65. The city filed a negative declaration for the project with the State Clearinghouse in September 2004 and a notice of determination in April 2006. The year it opened was not found.

As described in those filings, the trail starts at Galleria Boulevard and Berry Street on the west side of the creek, crosses the creek south of Roseville Parkway and passes under that road on the east bank, then follows Antelope Creek Road for about 400 feet before crossing it at grade. North of the road it continues as a Class 1 bike path, passing under the SR 65 overcrossing. The record on this page maps about 1.3 miles in two pieces, split at Antelope Creek Drive, and runs north from Roseville to Springview Drive in Rocklin, where OpenStreetMap shows the Antelope Creek Trailhead with parking.

OpenStreetMap maps the path as asphalt, designated for both bicycles and pedestrians, with a short concrete bridge near its southern end.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sacramento 5 ESE, 27.2 km from the trail's middle, 42 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566268748189949489796556
Low °F414447495459616159534541
Precipitation, in3.93.62.81.40.90.2000.10.91.83.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1953 Roseville sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Antelope Creek Trail (opens in a new tab)
360° panorama · Photo: RosevilleCreeks2025 · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Antelope Creek Bicycle and Pedestrian Trail Project, Notice of Determination (2006) — CEQAnet, California Governor's Office of Land Use and Climate Innovation · government source · checked Oct 17, 2026
    Supports: City of Roseville Public Works lead agency; 1.5 miles of shared bicycle path and pedestrian trail from Galleria Boulevard to the Roseville/Rocklin city limits north of SR 65; route details (Galleria/Berry start, west side of creek, crossing south of Roseville Parkway, about 400 feet along Antelope Creek Road with an at-grade crossing, Class 1 path under SR 65); notice received April 2006
  3. Antelope Creek Bicycle and Pedestrian Trail Project, Negative Declaration (2004) — CEQAnet · government source · checked Oct 17, 2026
    Supports: negative declaration received September 20, 2004; 1.5-mile reach of Antelope Creek; Placer County
  4. Antelope Creek Trail — OpenStreetMap way 82948837 · web · checked Oct 17, 2026
    Supports: name; asphalt cycleway designated for bicycles and pedestrians; northern end at Springview Drive, Rocklin
  5. Antelope Creek Trail (bridge) — OpenStreetMap way 82946121 · web · checked Oct 17, 2026
    Supports: concrete bridge near the southern end
  6. Antelope Creek Trailhead — OpenStreetMap node 12601025314 · web · checked Oct 17, 2026
    Supports: Antelope Creek Trailhead with parking near Springview Drive

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.