States › Florida

Archer Braid Trail

Greenway in Florida

Runs through Archer and Gainesville · Alachua County

Conditions now

Loading the weather near Archer…

Forecast by the National Weather Service for Archer · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
11.7 mi 18.8 km1
On former railbed
7.1 mi 61%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Southwest Archer Road mile 8.7 directions to trailhead 1
  2. Parking at Southwest Archer Road mile 9.3 directions to trailhead 2
  3. Parking at Southwest 47th Street mile 9.3 directions to trailhead 3
Archer Braid Trail (opens in a new tab)
Photo: pkoby · CC BY-SA 4.0 · Mapillary

About this trail

The Archer Braid Trail is a paved multi-use trail in Alachua County, Florida, linking the city of Archer with southwest Gainesville and the University of Florida. Alachua County develops it; WUFT reported that it was ranked the highest-priority bicycle and pedestrian project in 2004, and the county says the Florida Greenways and Trails Council classes it as a priority trail. It is part of the statewide SUN Trail network and of the county's Bicycle Master Plan, and WUFT gave its length as 12.3 miles in 2024.

The trail starts at the Water Tower Trailhead in downtown Archer, and the county describes an Archer Road corridor extending about 6 miles into the city. In June 2024 the county announced $13.1 million in state funding, a $10.67 million SUN Trail grant from the Florida Department of Transportation and a $2.5 million legislative appropriation, for the 1.67-mile Kanapaha addition from Veteran's Memorial Park to Celebration Pointe. That piece is to join two previously completed portions into a route of nearly 10 miles from Southwest 91st Street to UF Health Shands Hospital, connecting with the Archer Road corridor. WUFT reported that frequent flooding around Kanapaha Lake means much of the new segment will be boardwalk and that the grant requires completion by June 30, 2027. The county's third-quarter 2026 project list still placed the $13.2 million Kanapaha extension in pre-construction.

In Archer, the county commission approved a further extension of about 0.4 mile on February 28, 2023, to connect the existing trailhead with the Archer Historical Society Railroad Museum in the former Seaboard Air Line depot; the same 2026 list shows this Archer extension in pre-construction. The record's map line measures about 12 miles: about 9.5 from Archer northeast toward Gainesville and a 2.2-mile branch from Southwest 91st Street north and east to Southwest 75th Street. OpenStreetMap maps about 7 miles of it on a former railroad grade.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Gainesville Regional Airport, 21 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F677176828790919088827569
Low °F434650566370727269615145
Precipitation, in3.32.73.52.73.17.66.76.452.71.82.9
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Arredondo sheet (1:62,500); the 1966 Arredondo sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Alachua County to receive $13M for completion of Archer Braid Trail — Alachua County (June 4, 2024) · government source · checked Oct 16, 2026
    Supports: $13.1 million state funding: $10.67 million SUN Trail grant from FDOT and $2.5 million legislative appropriation; nearly 10 miles from SW 91st Street to UF Health Shands Hospital; 1.67-mile Kanapaha addition from Veteran's Memorial Park to Celebration Pointe connecting two completed portions; Archer Road Corridor extending 6 miles into Archer; priority trail of the Florida Greenways and Trails Council; Bicycle Master Plan
  3. 2026 Q3 Pre-Construction — Alachua County Communications · government source · checked Oct 16, 2026
    Supports: Archer Braid Trail – Kanapaha Extension ($13.2M) and Archer Braid Trail – Archer Extension listed in pre-construction, third quarter 2026
  4. $13.1 million state grant to help complete Archer Braid Trail expansion — WUFT (June 20, 2024) · organization · checked Oct 16, 2026
    Supports: 12.3-mile length; Kanapaha Lake flooding and boardwalks; grant requires completion by June 30, 2027; connection to Celebration Pointe, Butler Plaza and UF
  5. Extension of the Archer Braid Trail connects to a bigger community — WUFT (March 14, 2023) · organization · checked Oct 16, 2026
    Supports: Water Tower Trailhead in downtown Archer; highest-priority bike-ped project in 2004; SUN Trail network; 0.4-mile Archer extension approved Feb. 28, 2023, to the Archer Historical Society Railroad Museum in the historic Seaboard Air Line depot
  6. OpenStreetMap ways for this trail · web · checked Oct 16, 2026
    Supports: mapped line of about 12 miles: about 9.5 miles from Archer toward Gainesville and a 2.2-mile branch from Southwest 91st Street to Southwest 75th Street; about 7 miles on a former railroad grade

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.