Arthur Ray Teague Parkway Trail
Greenway in Louisiana
Runs through Bossier City · Bossier Parish
Conditions now
Loading the weather near Bossier City…
Forecast by the National Weather Service for Bossier City · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Arthur Ray Teague Parkway mile 0 directions to trailhead 1
- Parking at Arthur Ray Teague Parkway mile 2.2 directions to trailhead 2
- Parking at Shreveport Barksdale Highway mile 2.3 directions to trailhead 3
- Parking at Arthur Ray Teague Parkway mile 2.3 directions to trailhead 4
- Parking at Arthur Ray Teague Parkway mile 3.2 directions to trailhead 5
- Parking at Live Casino Boulevard mile 4.5 directions to trailhead 6
- Parking at Arthur Ray Teague Parkway mile 4.5 directions to trailhead 7
- Parking at Riverside Drive mile 4.6 directions to trailhead 8
About this trail
The Arthur Ray Teague Parkway Trail is a paved multi-use path along Arthur Ray Teague Parkway in Bossier City, Bossier Parish, Louisiana, beside the Red River. OpenStreetMap maps it at about 4.6 miles. It is a greenway, not a rail-trail.
Integrity, Inc., a contractor, reports building a two-mile extension of the path for the Red River Waterway Commission at a cost of $1.2 million. The extension runs from the front of the CenturyLink Center through the Red River National Wildlife Refuge to the boat launch. It is an eight-foot-wide asphalt path for running and biking, with a concrete retaining wall and a new pavilion inside the refuge.
The Red River National Wildlife Refuge lists an Arthur R. Teague Multi-Use Trail of 1.05 miles among its trails; the refuge page does not say where it lies or whether it is part of this path.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Shreveport Dwtn Airport, 7.1 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 59 62 70 78 85 92 95 95 90 79 68 60 Low °F 39 42 49 56 66 73 76 75 68 57 47 40 Precipitation, in 4.4 4.3 4.7 4.7 3.8 4.4 3.5 2.6 3.3 4.4 4 4.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1941 Forbing sheet (1:31,680); the 1955 Shreveport East sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Parkway High run path 1.6 mi away · 2.0 mi, surface unknown
- Fern Ave Trail 3.4 mi away · 1.6 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails - Red River National Wildlife Refuge (U.S. Fish and Wildlife Service) · government source · checked Oct 18, 2026 Supports: Arthur R. Teague Multi-Use Trail listed at 1.05 miles
- Arthur Ray Teague Parkway Trail Extension Project Completed for the RRWC - Integrity, Inc. · web · checked Oct 18, 2026 Supports: two-mile extension, route, eight-foot asphalt, cost, funding, retaining wall and pavilion
- OpenStreetMap ways for this trail · web · checked Oct 18, 2026 Supports: mapped length of about 4.6 miles, paved surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.