Assabet River Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Acton, Maynard, Hudson and Marlborough · Middlesex County
Conditions now
Loading the weather near Hudson…
Forecast by the National Weather Service for Hudson · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Assabet River Rail Trail (ARRT) is a partially-completed multi-use rail trail running through the cities and towns of Marlborough, Hudson, Stow, Maynard, and Acton, Massachusetts, United States. It is a conversion of the abandoned Marlborough Branch of the Fitchburg Railroad. The right-of-way parallels the Assabet River in the trail's midsection. At the north end it veers north to the South Acton MBTA train station while the south end veers south to Marlborough. When fully completed, the end-to-end length will be 12.5 miles (20.1 km). As of June 2020, the southwest 5.1-mile (8.2 km) portion of the trail from Marlborough to Hudson and the northeast 3.4-mile (5.5 km) portion running from the South Acton MBTA station to the Maynard–Stow border are completed. A recreational easement exists for users on the 1.9-mile (3.1 km) dirt road portion of Track Road in Stow. A paving easement for Track Road was acquired by 2021, but this project has not begun. No current plans exist for completing the 2.1-mile (3.4 km) gap from Sudbury Road, Stow to Wilkins Street, Hudson.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Cashman Street mile 0 · restrooms directions to trailhead 1
- Parking at Jefferson Street mile 0.2 directions to trailhead 2
- Parking at Sasseville Way mile 1.5 directions to trailhead 3
- Parking at Washington Street mile 2.8 directions to trailhead 4
- Parking at Giasson Street mile 3.1 directions to trailhead 5
- Parking at Giasson Street mile 3.1 directions to trailhead 6
- Parking at Washington Street mile 3.1 directions to trailhead 7
- Parking at Washington Street mile 3.1 directions to trailhead 8
- Parking at Railroad Avenue mile 3.7 directions to trailhead 9
- Parking at Church Street mile 3.7 directions to trailhead 10
- Parking at Church Street mile 3.7 directions to trailhead 11
- Parking at High Street mile 3.8 directions to trailhead 12
- Parking at Main Street mile 3.9 directions to trailhead 13
- Parking at Tower Street mile 4.1 directions to trailhead 14
- Parking at Cherry Street mile 4.2 directions to trailhead 15
- Parking at Main Street mile 4.3 · restrooms directions to trailhead 16
- Parking at Orchard Drive mile 5.2 directions to trailhead 17
- Parking at Winter Street mile 9.3 directions to trailhead 18
- Parking at Main Street mile 9.8 directions to trailhead 19
- Parking at Florida Road mile 10.1 directions to trailhead 20
- Municipal Lot mile 10.2 directions to Municipal Lot
- Parking at Nason Street mile 10.2 directions to trailhead 22
- Parking at Main Street mile 10.2 directions to trailhead 23
- Parking at Glendale Street mile 10.3 directions to trailhead 24
- Parking at Acton Street mile 10.9 directions to trailhead 25
- Parking at Brown Street mile 10.9 directions to trailhead 26
- Parking at Rockland Avenue mile 11.1 directions to trailhead 27
- Assabet River Rail Trail Parking mile 11.8 directions to Assabet River Rail Trail Parking
- Parking at Maple Street mile 12.3 directions to trailhead 29
(opens in a new tab) About this trail
The Assabet River Rail Trail is a partly completed rail trail through Marlborough, Hudson, Stow, Maynard and Acton, Massachusetts, on the former Marlborough Branch of the Fitchburg Railroad. Its planned length is 12.5 miles. The branch reached Maynard from Acton by 1849, Hudson in 1850 and Marlborough in 1855, and in its middle section the corridor follows the Assabet River. Passenger service ended at Marlborough in 1930, at Hudson and Stow in 1939 and at Maynard in 1958, and the last freight train ran to Hudson in 1980. The five towns maintain the trail.
Planning dates to at least 1992; a 1997 state feasibility study supported the trail and the five towns approved it in 1998. Construction began in Marlborough in 2000, and by 2005 the 5.1-mile southern section from Marlborough to a lot on Wilkins Street in Hudson was complete. The 3.4-mile northern section, from the South Acton MBTA station through Maynard to the Maynard–Stow line, broke ground on July 21, 2016 and opened on August 10, 2018. At Wilkins Street the trail connects with the Mass Central Rail Trail–Wayside, whose 7.5-mile Sudbury–Hudson segment DCR built in 2025, and Hudson plans to share 0.75 miles of the trail, from Wilkins Street to Priest Street, with that route.
The two built sections are paved; a gap of about 4 miles separates them. Its eastern 1.9 miles is Track Road in Stow, a dirt road that is the main access to Crow Island Airpark; the town bought a recreational easement over its full length in 2004 and again in 2008. MassDOT project 613096 would build a shared-use path along Track Road while keeping vehicle access to the airpark; its 25 percent design was received in January 2026. The western 2.1 miles, from Sudbury Road in Stow to Wilkins Street in Hudson, has no bridges at two Assabet River crossings and includes private property, and no plans exist to complete it.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 59% of this route as a trail on former railroad right-of-way.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Maynard 2, 8.5 km from the trail's middle, 3 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 41 48 62 73 81 87 85 78 66 54 43 Low °F 15 16 24 34 45 55 60 58 49 38 29 21 Precipitation, in 3.6 3.3 4.6 4.4 3.7 4.2 4 4.4 3.9 5.1 3.8 4.8 - Wildlife refuges
Passes beside Assabet River National Wildlife Refuge.
- On the National Register
- Marlborough Center Historic District, Marlborough · historic district, listed 1998 · nomination file for Marlborough Center Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1887 Marlboro sheet (1:62,500); the 1950 Hudson sheet (1:24,000) shows the area at mid-century. Browse all 19 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Community
What riders say on Reddit
- Riders in 2024 and 2026 reported uneven winter clearing: the Maynard section was snow-covered with no official winter upkeep, per one commenter, while Marlborough's stretch was plowed and Hudson's was not. r/bikeboston, Jan 2024 · r/massachusetts, Feb 2026 · r/massachusetts, Mar 2026
- Riders in 2024 and 2025 described an orchard in Stow that owns part of the old corridor as the obstacle to closing the gap; one found the road alternative too busy with cars. r/massachusetts, Sep 2024 · r/bikeboston, May 2025
- One rider in 2025 said the new Sudbury–Hudson trail links the Assabet trail to the Bruce Freeman Rail Trail, and that parts of a hiking route through the wildlife refuge bar bikes. r/bikeboston, May 2025
7 Reddit threads about this trail, Jan 2024 to May 2026
- Fresh pavement, newly refurbished ADA accessible bridge, newly planted native trees and vegetation, and new osprey nest platform in Sudbury, on the Mass Central Rail Trail - Wayside r/bikeboston · May 2025 · 17 comments
- Which rail trails are plowed? r/massachusetts · Feb 2026 · 5 comments
- Who is in charge of maintaining the Assabet River Rail Trail? r/bikeboston · Jan 2024 · 5 comments
- Honey Pot Apple Cider Donuts r/massachusetts · Sep 2024 · 64 comments
- It was over 70° yesterday. GO AWAY!!! r/massachusetts · Mar 2026 · 92 comments
- Family Bike Rides? r/bikeboston · May 2026 · 12 comments
- Mass Central Rail Trail ride calls attention to work still to be done and the benefit of finishing the trail — Mass Parks For All r/bikeboston · Oct 2024 · 13 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Mass Central Rail Trail within 0.2 mi · 70.4 mi, paved
- Bruce Freeman Rail Trail 2.5 mi away · 19.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 8443314, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Assabet River Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q4808311, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Project 613096: Stow – Shared Use Path Construction on Track Road along Assabet River Rail Trail — MassDOT Highway Division project information · government source · checked Oct 13, 2026 Supports: Track Road shared-use path keeping vehicle access to Crow Island Airpark, closing a gap, 25% design package received January 8, 2026
- Transportation — Town of Stow · government source · checked Oct 13, 2026 Supports: Track Road recreational easements of 2004 and 2008, Track Road as primary access to Crow Island Air Park
- Mass Central Rail Trail - Wayside — Department of Conservation and Recreation, Mass.gov (updated February 2026) · government source · checked Oct 13, 2026 Supports: 7.5-mile MCRT Sudbury–Hudson segment to Wilkins Street and the connection to the Assabet River Rail Trail, built by DCR in 2025
- Assabet River Rail Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: towns, Marlborough Branch of the Fitchburg Railroad, 12.5-mile planned length, construction dates of the branch 1849–1855, Assabet River, end of passenger service 1930/1939/1958, last freight 1980, town maintenance, 1992 planning, 1997 study, 1998 approval, 2000 construction start, 5.1-mile south section by 2005, 3.4-mile north section groundbreaking July 21, 2016 and ribbon-cutting August 10, 2018, Hudson sharing Wilkins Street to Priest Street with the MCRT, 4-mile gap, 1.9-mile Track Road dirt section, 2.1-mile western gap without bridges, with private property and no plans
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.


