States › Texas

Austin to Manor Trail

Greenway in Texas · OpenStreetMap relation

Runs through Austin · Travis County

Conditions now

Loading the weather near Austin…

Forecast by the National Weather Service for Austin · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Austin to Manor Trail is a multi-use cycling and pedestrian trail in Travis County, Texas, United States. Spanning approximately 5.5 miles (8.9 km), the trail provides a continuous off-road connection between northeastern Austin and the suburb of Manor and follows the proposed Capital Metro Green Line, linking to the larger Southern Walnut Creek Trail system.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
5.4 mi 8.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Chasewind Lane mile 0.5 directions to trailhead 1
  2. Parking at Fairbend Lane mile 0.6 directions to trailhead 2
  3. Parking at Fairbend Lane mile 0.6 directions to trailhead 3
  4. Parking at Braxton Robert Road mile 0.6 directions to trailhead 4
  5. Parking at Decker Lane mile 1.2 directions to trailhead 5
  6. Parking mile 2.4 directions to trailhead 6
  7. Parking at Old Highway 20 mile 5.1 directions to trailhead 7
  8. Parking at West Carrie Manor Street mile 5.5 · restrooms directions to trailhead 8
  9. Parking at West Carrie Manor Street mile 5.5 · restrooms directions to trailhead 9
Walnut Creek Urban Trail Austin Texas (opens in a new tab)
Walnut Creek Urban Trail Austin Texas · Photo: Larry D. Moore · CC BY 4.0 · Wikimedia Commons

About this trail

The Austin to Manor Trail is a paved multi-use trail of about 5.5 miles in Travis County, Texas, linking northeast Austin with the suburb of Manor. It was planned under the City of Austin's 2014 Urban Trails Plan. The trail is a rail-with-trail rather than a rail-trail: it runs beside train tracks owned by Capital Metro, the corridor proposed for the Green Line commuter service from downtown Austin toward Colony Park, Manor and Elgin, which in 2024 had no start date for its Manor phase.

The first section, about 2.5 miles of concrete from Daffan Lane to Lindell Lane, was finished in 2014 and stopped near Decker and Lindell lanes, 2.9 miles short of Manor. From its western end at the Southern Walnut Creek Trail, the route runs northeast through the Decker Tallgrass Prairie Preserve and along or near Decker Lane. The final 2.9-mile section continues past Walter E. Long Park and through open countryside to Ben E. Fisher Park in Manor. It opened in August 2024, at a cost of $8.31 million, of which $3.77 million was federal money distributed through the Capital Area Metropolitan Planning Organization, $3.27 million came from Austin mobility bonds and $1.27 million from Travis County.

The path is 10 to 12 feet wide and mostly flat. At its Austin end it joins the Southern Walnut Creek Trail, which continues past a YMCA and the Austin Tennis Center to Govalle Park in East Austin. Manor's mayor said in 2024 that Travis County plans to continue the trail through Manor.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Austin-Camp Mabry, 15.5 km from the trail's middle, 32 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F626673808793979891827264
Low °F424652596773757570615043
Precipitation, in2.61.92.92.453.722.73.53.92.92.7
Snow, in00.20000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1968 Manor sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • A rider in 2024 said the new stretch had little shade and advised carrying plenty of water; another in 2025 said the park at the Manor end had locked facilities, including the fountain. r/BikingATX, Aug 2024 · r/Austin, Oct 2025
  • Riders in 2024 and 2025 described the paved Southern Walnut Creek and Austin to Manor trails as one continuous route of roughly 13 to 14 miles each way, from Govalle Park to Manor. r/BikingATX, Oct 2024 · r/Austin, Jan 2025 · r/BikingATX, Aug 2025
  • Riders in 2024 and 2025 named Govalle Park and the YMCA off 183 as access points, and a 2025 rider listed both as places to park. r/BikingATX, Aug 2024 · r/Austin, Sep 2025
  • Riders in 2025 described the route as mostly used by cyclists and runners, with fewer walkers and dog walkers than the river trails. r/BikingATX, Aug 2025
7 Reddit threads about this trail, Aug 2024 to Oct 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6848582, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Austin to Manor Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q135929044, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Austin to Manor Trail now complete, linking suburb to citywide trail network — KUT (August 22, 2024) · organization · checked Oct 15, 2026
    Supports: completion in August 2024, 12-foot paved trail from Ben E. Fisher Park through countryside and Walter E. Long Park to the Southern Walnut Creek Trail, Southern Walnut Creek Trail past YMCA and Austin Tennis Center to Govalle Park, first section finished 2014 stopping at Lindell and Decker lanes 2.9 miles short, $8.31 million cost and funding split, runs beside Capital Metro-owned tracks, Green Line plans and no start date for Manor phase, county plans to continue the trail through Manor
  5. Austin to Manor Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: about 5.5 miles in Travis County, 2014 Urban Trails Plan, Section 1 Daffan Lane to Lindell Lane 2.5 miles concrete opened 2014, Decker Tallgrass Prairie Preserve, route along or near Decker Lane, 10-12 feet wide, mostly flat

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.