B2B Trail (Dexter Section)
Greenway in Michigan
Runs through Dexter and Scio Township · Washtenaw County
Conditions now
Loading the weather near Dexter…
Forecast by the National Weather Service for Dexter · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 2nd Street mile 0 directions to trailhead 1
- Parking at Huron Street mile 0 directions to trailhead 2
- Parking at Dexter-Huron Metropark mile 1.2 directions to trailhead 3
- Parking at Dexter-Huron Metropark mile 1.2 directions to trailhead 4
- Parking at Dexter-Huron Metropark mile 1.5 · restrooms · water directions to trailhead 5
- Parking at Dexter-Huron Metropark mile 1.5 directions to trailhead 6
- Parking at Dexter-Huron Metropark mile 1.5 directions to trailhead 7
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
This record covers about 1.5 miles of the Border-to-Border (B2B) Trail at Dexter, Washtenaw County, Michigan, a paved stretch mapped between the village and Dexter-Huron Metropark. The B2B is a non-motorized trail across Washtenaw County, planned and maintained by the Washtenaw County Parks and Recreation Commission with the Huron Waterloo Pathways Initiative as its private-fundraising partner. The trail's website reports about 43 of a planned 55 miles complete.
Wikipedia describes the River Terrace Trail as the link between the village of Dexter and the park, and the trail then continues east toward Ann Arbor. In 2019 a 1.2-mile segment from Dexter-Huron Metropark to Zeeb Road was reported as a 10-foot-wide asphalt trail with six boardwalk sections and two bridges over the Huron River.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
57% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chelsea, 11.9 km from the trail's middle, 14 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 70 79 82 80 74 61 47 36 Low °F 16 17 25 37 48 56 61 59 51 40 31 23 Precipitation, in 2.4 2 2.2 3 3.8 3.6 3.5 3.6 2.7 3.1 2.6 2.1 Snow, in 10.9 8.6 4.7 0.9 0 0 0 0 0 0 1.8 6 - Old maps
USGS topographic maps of the trail's middle go back to the 1902 Dexter sheet (1:62,500); the 1965 Ann Arbor West sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationB2B Trail updates
- FacebookBorder to Border Trail (Facebook)
Nearby trails
- Dexter-Hudson Mills Washtenaw B2B Trail Section 0.4 mi away · 4.4 mi, paved
- B2B Trail 1.0 mi away · 8.4 mi, paved
- B2B Trail (Chelsea-Dexter Section) 1.1 mi away · 4.4 mi, paved
- Miller Bikeway 4.6 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Border to Border Trail (B2B Trail) · organization · checked Oct 17, 2026 Supports: managers, 55-mile plan, mileage complete
- Border-to-Border Trail - Wikipedia · organization · checked Oct 17, 2026 Supports: River Terrace Trail links Dexter and Dexter-Huron Metropark; trail continues toward Ann Arbor
- Work Begins On Next Section Of Border To Border Trail - WHMI · web · checked Oct 17, 2026 Supports: 1.2-mile Dexter-Huron Metropark to Zeeb Road segment, asphalt, boardwalk, bridges
- OpenStreetMap relation 135132 (Dexter) · web · checked Oct 17, 2026 Supports: village boundary containing the route
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.