States › Kansas

Bad Bobby Trail

Greenway in Kansas · OpenStreetMap relation

Runs through Hutchinson · Reno County

Conditions now

Loading the weather near Hutchinson…

Forecast by the National Weather Service for Hutchinson · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.2 mi 8.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Bad Bobby Trailhead mile 0 directions to Bad Bobby Trailhead
  2. Parking at North Lorraine Street mile 3 directions to trailhead 2
  3. Parking at Wheatland Drive mile 3 directions to trailhead 3
  4. Bad Bobby Trailhead mile 3.1 directions to Bad Bobby Trailhead
  5. Parking at East 23rd Avenue mile 3.1 directions to trailhead 5
  6. Parking at East 23rd Avenue mile 3.2 directions to trailhead 6
  7. Parking at East 23rd Avenue mile 3.3 directions to trailhead 7
  8. Parking at East 23rd Avenue mile 3.5 directions to trailhead 8
Hutchinson, along the trail (opens in a new tab)
Hutchinson, along the trail · Photo: Hellbus · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Bad Bobby Trail is a paved trail in Hutchinson, Kansas, formerly known as the GVI trail. GVI stands for Grand View Interceptor, the name of the ditch beside it. In December 2023 Hutch Post reported that the city's Director of Parks and Facilities, Justin Combs, proposed the official name Bob Helfrich, "Bad Bobby" Memorial Trail, honoring a Hutchinson bicycling enthusiast, and that the council approved the naming; he described the trail as 3.8 miles. The OpenStreetMap record, which names the trail and credits the City of Hutchinson as operator, measures about 5.2 miles of concrete and other paved cycleway.

The city planned a trailhead on North Plum Street on donated land, with a concrete parking lot and a gazebo. In October 2024 Hutch Post reported that the Plum Street trailhead, at 39th and Plum, was being improved, with a kinetic sculpture of Bob Helfrich to be mounted there; the trail remained open while the lot was closed until the work was finished.

OpenStreetMap shows a second trailhead about 1.4 miles along the route. The difference between the reported 3.8 miles and the mapped length was not explained by a fetched page.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Hutchinson, 0.9 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F455060707989949284725846
Low °F192332415363686657443122
Precipitation, in0.81.22.32.65.54.544.12.42.51.51.4
Snow, in1.42.40.90.3000000.10.61.2
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Hutchinson sheet (1:125,000); the 1960 Hutchinson sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 21116347, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Hutch Post, December 20, 2023 · press · checked Oct 18, 2026
    Supports: former GVI name, meaning of GVI, naming approval, 3.8 miles, planned North Plum trailhead
  3. New trailhead taking shape — Hutch Post, October 2, 2024 · press · checked Oct 18, 2026
    Supports: trailhead improvement, sculpture, trail open and lot closed
  4. OpenStreetMap relation 21116347 · web · checked Oct 18, 2026
    Supports: record length, paved surface, operator City of Hutchinson, second trailhead

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.