States › Wisconsin

Badger State Trail

Rail-trail in Wisconsin · OpenStreetMap relation

Runs through Madison, Fitchburg, Montrose, Belleville, Village of Monticello, Town of Washington (Green County), Town of Monroe (Green County), Monroe and 4 more · Dane and Green counties

All 12 towns and places

Madison, Fitchburg, Town of Oregon, Montrose, Belleville, Exeter, Village of Monticello, Town of Mount Pleasant, Town of Washington (Green County), Town of Monroe (Green County), Monroe and Clarno

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Badger State Trail is a 40-mile (64 km) bicycle trail in south central Wisconsin. The trail leads from the Wisconsin – Illinois state line to Madison passing through, from south to north, Monroe, Monticello, Belleville and Fitchburg. Near Monticello, the trail passes through the 1,200-foot (370 m) long, unlit Stewart Tunnel constructed in 1887. The trail was officially opened July 8, 2007.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
38.1 mi 61.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Allied Drive mile 0.1 directions to trailhead 1
  2. Parking at Executive Drive mile 1 directions to trailhead 2
  3. Parking at Executive Drive mile 1 directions to trailhead 3
  4. Parking at Marketplace Drive mile 1.1 directions to trailhead 4
  5. Badger State Trail Parking mile 6 directions to Badger State Trail Parking
  6. Parking at Greenway Cross Court mile 11.9 directions to trailhead 6
  7. Parking at 5th Avenue mile 12.1 directions to trailhead 7
  8. Parking at East Main Street mile 12.6 · water directions to trailhead 8
  9. Parking at Vine Street mile 12.6 · restrooms · water directions to trailhead 9
  10. Parking at East Pearl Street mile 12.7 · restrooms · water directions to trailhead 10
  11. Parking at East Church Street mile 12.7 · restrooms · water directions to trailhead 11
  12. Parking at East Pearl Street mile 12.7 · restrooms · water directions to trailhead 12
  13. Parking at West School Street mile 12.9 directions to trailhead 13
  14. Parking at 1st Street mile 31.6 directions to trailhead 14
  15. Parking at 4th Street mile 31.7 directions to trailhead 15
  16. Parking at 4th Street mile 31.8 directions to trailhead 16
  17. Parking at 14th Avenue mile 32.1 · restrooms · water directions to trailhead 17
  18. Parking at 16th Avenue mile 32.1 · restrooms · water directions to trailhead 18
  19. Parking at Park Drive mile 32.2 · restrooms · water directions to trailhead 19
  20. Parking at 12th Avenue mile 32.4 directions to trailhead 20
  21. Parking at 8th Street mile 32.5 directions to trailhead 21
  22. Parking at 10th Ave Court mile 32.5 directions to trailhead 22
  23. Parking at 10th Ave Court mile 32.5 directions to trailhead 23
  24. Parking at 8th Street mile 32.6 directions to trailhead 24
  25. Parking at 8th Street mile 32.7 directions to trailhead 25
  26. Parking at 4th Avenue West mile 33.5 directions to trailhead 26
  27. Parking at Bethel Road mile 33.6 directions to trailhead 27
Monticello Segment - Ice Age Trail (opens in a new tab)
Monticello Segment - Ice Age Trail · Photo: Amy Bayer · CC BY-ND · Flickr

About this trail

The Badger State Trail is a 40-mile rail trail in Dane and Green counties, Wisconsin, between Madison and the Wisconsin–Illinois state line. The Wisconsin Department of Natural Resources manages it. The DNR traces the corridor to a line from Freeport, Illinois, to Madison that the Illinois Central began building in 1886. After the line was acquired from the Illinois Central Gulf in 1980, the Wisconsin and Calumet Railroad operated it from 1981, but the section from Summit, just south of the Madison Beltline, to Freeport was embargoed in December 1993. The Natural Resources Board approved the trail's master plan in 2006, and the trail opened with a ribbon cutting in Belleville on July 8, 2007.

The north end is at Arrowhead Park in Madison, where the trail meets the Southwest Path. Heading south it passes Fitchburg, Basco, Belleville, Monticello, Monroe and Clarno, and at the state line it continues into Illinois as the Jane Addams Trail toward Freeport. It links with the Capital City State Trail near Madison, meets the Sugar River State Trail just south of that trail's rest area in Monticello and connects with the Cheese Country Trail in Monroe. Parking includes Dawley Park in Fitchburg, Purcell Road and Library Park in Belleville.

The 6 miles from Madison to Purcell Road are asphalt; the remaining 34 miles are crushed stone. The Stewart Tunnel, a curved quarter-mile tunnel south of Belleville begun in 1886, has been closed since 2019 because of falling rock; Tunnel Road serves as the detour. The 2023–2025 state budget included $6.6 million for repairs with a corrugated metal liner, and as of October 2026 the DNR expected a temporary opening in late 2026 and a closure in spring 2027 to finish the work. The trail is open year-round; bicyclists and in-line skaters 16 and older need a state trail pass. In winter snowmobiles may use the trail south of Purcell Road.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Monroe Wwtp, 19.6 km from the trail's middle, 47 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F273144577079828073594532
Low °F111425374859636152402818
Precipitation, in1.61.72.13.84.16.24.24.54.23.22.41.9
Snow, in11.810.54.71.40.300000.41.810.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1923 New Glarus sheet (1:62,500); the 1962 Belleville sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 said road bikes on 25 to 32 mm tires handled the crushed limestone, with wider tires more comfortable and soft or rutted stretches the exception. r/madisonwi, May 2024
  • Riders in 2024 and 2025 described the Tunnel Road detour around the closed Stewart Tunnel as well marked; one said traffic was sparse but fast and advised against it without rural-road experience. r/madisonwi, Jul 2024 · r/wisconsin, Jun 2025
  • Riders in November 2026 reported the Stewart Tunnel open and warned that its bend makes it very dark, advising a proper bike light over a phone. One said Apple Maps sent him to a private driveway instead of Tunnel Road. r/madisonwi, Nov 2026
18 Reddit threads about this trail, Jan 2024 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Badger State Trail (opens in a new tab)
360° panorama · Photo: vgxhc · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1627581, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Badger State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q799004, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Basic Information | Badger State Trail — Wisconsin DNR · government source · checked Oct 14, 2026
    Supports: 40 miles; asphalt 6 miles and crushed stone 34 miles; Dane and Green counties; communities Madison, Fitchburg, Basco, Belleville, Monticello, Monroe, Clarno; parking at Dawley Park, Purcell Road, Library Park in Belleville, Monticello rest area and Monroe park; Sugar River trail connection; open year-round; trail pass for bicyclists and skaters 16 and older; friends group
  6. History | Badger State Trail — Wisconsin DNR · government source · checked Oct 14, 2026
    Supports: Illinois Central began the Freeport–Madison line in 1886; 1980 acquisition from Illinois Central Gulf; Wisconsin and Calumet from 1981; Summit–Freeport embargo December 1993; 2006 master plan approval; curved tunnel south of Belleville; tunnel work began 1886; quarter-mile length; 2019 closure and Tunnel Road detour
  7. Stewart Tunnel | Badger State Trail — Wisconsin DNR · government source · checked Oct 14, 2026
    Supports: closure since 2019 for falling rock; $6.6 million in 2023–2025 budget; corrugated metal pipe lining; temporary opening expected late 2026 and closure in spring 2027 (updated October 7, 2026)
  8. Recreation | Badger State Trail — Wisconsin DNR · government source · checked Oct 14, 2026
    Supports: asphalt between Madison and Purcell Road; Ice Age Trail shares two sections; snowmobiles south of Purcell Road; winter ATV use between Monroe and Monticello under conditions
  9. Badger State Trail — Wisconsin DNR · government source · checked Oct 14, 2026
    Supports: 40 miles between Madison and the Wisconsin-Illinois border; connects to the Capital City and Sugar River state trails; DNR management
  10. Badger State Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: opening ribbon cutting in Belleville on July 8, 2007; north end at Arrowhead Park and the Southwest path; Jane Addams Trail at the state line toward Freeport; Cheese Country Trail in Monroe

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.