States › Oregon

Banks-Vernonia State Trail

Rail-trail in Oregon

In Washington County

Conditions now

Loading the weather near Banks…

Forecast by the National Weather Service for Banks · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Banks–Vernonia State Trail is a paved rail trail and state park in northwest Oregon in the United States. It runs for 21 miles (34 km), primarily north–south, between the towns of Vernonia in Columbia County and Banks in Washington County on an abandoned railroad bed. Banks is about 25 miles (40 km) west of Portland.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
4.0 mi 6.4 km1
On former railbed
3.8 mi 95%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. L.L. Stub Stewart State Park mile 3.2 directions to L.L. Stub Stewart State Park
  2. Tophill Trailhead mile 4.7 · restrooms directions to Tophill Trailhead

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

Banks Trailhead-2.jpg (opens in a new tab)
Banks Trailhead-2.jpg · Photo: Geirfuglasker · CC BY-SA 4.0 · Wikimedia Commons

About this trail

This record maps about 4 miles of the Banks-Vernonia State Trail, a paved rail trail of about 21 miles between Banks and Vernonia in northwest Oregon. Oregon Parks and Recreation Department (OPRD) manages the trail. The railway was abandoned in 1973; the state bought the right of way in 1974 and OPRD took it over in 1990, making the trail Oregon's first rails-to-trails state park. Wikipedia reports the Portland, Astoria & Pacific Railroad built the line in 1913.

The mapped section includes the Tophill Trailhead and runs near L. L. Stub Stewart State Park, which Wikipedia says connects to about 20 miles of unpaved mountain-biking trails. A paved 8-foot path for hikers and bicyclists runs beside a gravel path for horses; the Tophill Trestle, damaged by fire in 1986, is bypassed by switchbacks. Electric-assisted bicycles are permitted, and a day-use parking permit is required at the trailheads.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

80% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Vernonia #2, 15.9 km from the trail's middle, 23 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F464954596670777873615144
Low °F323134364044474743383431
Precipitation, in6.95.35.33.72.41.40.40.61.84.17.78.3
Snow, in0.30.60000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1941 Gales Creek sheet (1:62,500); the 1956 Forest Grove sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Banks–Vernonia State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q4856794, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Banks-Vernonia State Trail - Oregon State Parks · government source · checked Oct 17, 2026
    Supports: about 21 miles, OPRD, paved 8-foot path with horse path, abandonment 1973, purchase 1974, transfer 1990, first rails-to-trails state park, e-bikes, day-use permit
  6. Banks-Vernonia State Trail - Wikipedia · organization · checked Oct 17, 2026
    Supports: 1913 construction by Portland, Astoria & Pacific Railroad, Tophill Trestle fire and bypass, Stub Stewart mountain-bike connection
  7. OpenStreetMap · web · checked Oct 17, 2026
    Supports: mapped length of this record, Tophill Trailhead and L. L. Stub Stewart State Park location

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.