States › North Carolina

Beaver Creek Greenway

Greenway in North Carolina

Runs through Apex · Wake County

Conditions now

Loading the weather near Apex…

Forecast by the National Weather Service for Apex · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.5 mi 7.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at High Holborn Court mile 0 directions to trailhead 1
  2. Parking at High Holborn Court mile 0.1 directions to trailhead 2
  3. Parking at Kelly Road mile 2.1 directions to trailhead 3
  4. Parking at Olive Chapel Road mile 4.9 directions to trailhead 4
Apex, along the trail (opens in a new tab)
Apex, along the trail · Photo: Seth Ilys at English Wikipedia · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Beaver Creek Greenway is a paved greenway in Apex, North Carolina, in Wake County. In January 2022 Wake County voted to fund Apex greenway projects, the first of which was to complete the 6.5-mile Apex West–Beaver Creek Greenway corridor, with construction to begin later that year. A listing on Fun 4 Raleigh Kids gives a projected corridor length of 6.44 miles, built 10 feet wide of asphalt with boardwalks and sidewalk connections.

In October 2025 the town opened a 1.2-mile extension that links Kelly Road Park with Apex Nature Park. CBS 17 reported that the greenway was already more than 6 miles long but had been split into separate sections, and that the extension lets people travel from Apex Nature Park to downtown Apex. The listing places one end of the built greenway at Jaycee Park, 451 NC Highway 55, which has parking. Restrooms and water fountains are at Kelly Road Park and Jaycee Park, and the greenway is open from dawn to dusk to walkers, runners, cyclists, skaters, wheelchair users and leashed dogs.

Our map record covers about 4.5 miles in OpenStreetMap, from near Olive Chapel Road in the west to near High Holborn Court in the east, mapped as asphalt. On the map it is in three pieces that do not join, a 1.1-mile western piece, a 3-mile middle piece through Kelly Road Park and a short eastern piece, so the record may not yet show the full route joined by the 2025 extension.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Apex, 5.6 km from the trail's middle, 54 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F515462727986898782726254
Low °F313339485765696862504034
Precipitation, in3.634.13.63.84.35.14.65.33.73.53.7
Snow, in2.910.400000000.30.2
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Raleigh sheet (1:250,000); the 1954 Raleigh sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Funding approved, construction to begin on new greenways in Apex — ABC11 (Jan. 5, 2022) · web · checked Oct 16, 2026
    Supports: Wake County funding vote, first project to complete the 6.5-mile Apex West–Beaver Creek Greenway corridor, construction to begin later in 2022
  3. 2 new greenway extensions open in Apex as town celebrated Great Trails State Day — CBS 17 (Oct. 19, 2025) · web · checked Oct 16, 2026
    Supports: 1.2-mile extension from Kelly Road Park to Apex Nature Park, greenway previously over 6 miles but in separate sections, travel from Apex Nature Park to downtown Apex
  4. Beaver Creek Greenway — Fun 4 Raleigh Kids (verified May 23, 2026) · web · checked Oct 16, 2026
    Supports: projected corridor length 6.44 miles, 10-foot asphalt with boardwalk and sidewalk connections, greenway extends from Jaycee Park (451 NC Hwy 55, parking), restrooms and water at Kelly Road Park and Jaycee Park, dawn to dusk, permitted uses
  5. Beaver Creek Greenway — OpenStreetMap way 113312666 (one of the record's ways) · web · checked Oct 16, 2026
    Supports: mapped length and extent from near Olive Chapel Road to near High Holborn Court, asphalt, three unjoined pieces

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.