States › Arkansas

Bellview Road Trail

Greenway in Arkansas · OpenStreetMap relation

Runs through Rogers · Benton County

Conditions now

Loading the weather near Rogers…

Forecast by the National Weather Service for Rogers · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Bellview Road Trail drawn on the 1954 USGS topographic map of Tulsa, Oklahoma
Then: the 1954 USGS Tulsa sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Bellview Road Trail is a paved shared-use path of about 2.2 miles in Rogers, Benton County, Arkansas, along Bellview Road. In OpenStreetMap it is a bicycle route, reference BR, in the Rogers local cycle network, made up of 19 mapped ways.

The City of Rogers announced a ribbon cutting at 10:00 a.m. on January 25 for the northern section of Bellview Road, held on the Greenway Bike Trail overlooking the Bellview improvements; the notice gives no year. Rogers lies on the Razorback Regional Greenway, a primarily off-road shared-use system of about 40 miles dedicated on May 2, 2015, and the Rogers trailhead is at Horsebarn Park. The fetched pages do not state who built the Bellview Road Trail or when it opened.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bentonville 4 S, 5.8 km from the trail's middle, 30 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F465160697785899082715949
Low °F242736445463666557463627
Precipitation, in2.72.74.24.86.35.53.92.743.43.93.3
Snow, in3.22.32.600000000.21.2
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Fayetteville sheet (1:125,000); the 1954 Tulsa sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10745421, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Bellview Road North Ribbon Cutting — City of Rogers · government source · checked Oct 18, 2026
    Supports: ribbon cutting January 25, 10:00 a.m., Greenway Bike Trail
  3. Razorback Greenway — Wikipedia · organization · checked Oct 18, 2026
    Supports: 40 miles, dedicated May 2, 2015
  4. OpenStreetMap relation 10745421 (Bellview Road Trail) · web · checked Oct 18, 2026
    Supports: name, ref BR, Rogers network, 19 ways
  5. Get Connected — Destination Rogers · web · checked Oct 18, 2026
    Supports: Rogers trailhead at Horsebarn Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.