BG Greenway
Greenway in Kentucky
Runs through Bowling Green · Warren County
Conditions now
Loading the weather near Bowling Green…
Forecast by the National Weather Service for Bowling Green · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Soccer Parking Lot mile 2.3 directions to Soccer Parking Lot
- Jones Jaggers Lot mile 2.5 directions to Jones Jaggers Lot
- Service Supply Lot mile 2.5 directions to Service Supply Lot
- Parking at East 4th Avenue mile 4.4 · restrooms directions to trailhead 4
- Parking at Center Street mile 4.6 directions to trailhead 5
- Parking at East 2nd Avenue mile 4.6 directions to trailhead 6
- Parking at Center Street mile 4.7 directions to trailhead 7
- Parking at Riverview Drive mile 4.9 · restrooms directions to trailhead 8
- Parking at 31-W By-Pass mile 5 directions to trailhead 9
- Parking at East 1st Avenue mile 5.1 directions to trailhead 10
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
BG Greenway is the name OpenStreetMap gives to a set of separate paved path pieces in Bowling Green, Kentucky, which together make up about 8.4 miles on our map. They are parts of the city's greenway network rather than a single trail. The City-County Planning Commission of Warren County runs BikeWalkBG, the community's bicycle and pedestrian program, which publishes a map of Bowling Green's greenways, parks and recommended bike routes; no city page using the name "BG Greenway" for one route was found.
The mapped pieces lie mostly near downtown, along Riverview Drive, Center Street and the 31-W By-Pass, with others to the southeast. Mitch McConnell Park, the Riverwalk at 426 East Riverview Drive, is part of the BikeWalk BG trail system, with a walking bridge, benches and restrooms that close at sunset. The planning commission's spring 2025 update lists pedestrian islands on Riverview Drive at Center and College streets to reach Riverfront Park, the College Street pedestrian bridge and the greenways there, as well as work on the Jennings Creek Greenway, which would fill the largest gap in the regional network between Hobson Grove Park and Morgantown Road.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bowling Green Warren County Airport, 3.3 km from the trail's middle, 19 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 51 60 71 79 87 90 89 83 72 59 49 Low °F 28 31 38 47 57 66 70 68 60 48 38 32 Precipitation, in 3.6 4.1 4.5 4.8 5 4.5 4.3 3.9 3.6 3.6 3.7 4.3 Snow, in 3.2 2.9 1.4 0.1 0 0 0 0 0 0 0.1 0.8 - On the National Register
- Confederate Monument of Bowling Green, Bowling Green · object, listed 1997 · nomination file for Confederate Monument of Bowling Green
- Old maps
USGS topographic maps of the trail's middle go back to the 1921 Bowling Green sheet (1:62,500); the 1954 Bowling Green South sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBikeWalkBG (City-County Planning Commission)
- RedditSearch Reddit: r/Kentucky
Nearby trails
- Greenway within 0.2 mi · 3.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- BikeWalkBG — City County Planning Commission · organization · checked Oct 15, 2026 Supports: BikeWalkBG is the community's bicycle and pedestrian program; its map displays all greenways, parks and points of interest in Bowling Green
- BikeWalkBG Updates / Events — City County Planning Commission · organization · checked Oct 15, 2026 Supports: pedestrian islands on Riverview Dr. at Center and College streets to reach Riverfront Park, the College St. pedestrian bridge and the greenways there; Jennings Creek Greenway would fill the largest gap in the regional greenway network from Hobson Grove Park to Morgantown Road
- Mitch McConnell Park "Riverwalk" — Bowling Green Parks & Recreation · organization · checked Oct 15, 2026 Supports: 426 East Riverview Drive; walking bridge; benches; restrooms close at sunset; part of the BikeWalk BG Trail system
- Way: BG Greenways (454984665) — OpenStreetMap · web · checked Oct 15, 2026 Supports: name BG Greenway / BG Greenways on separate asphalt path ways open to bicycles; extent of the mapped pieces and their streets (from our trail record built from these ways)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.