States › Florida

Biscayne-Everglades Greenway Trail

Greenway in Florida

Runs through Homestead · Miami-Dade County

Conditions now

Loading the weather near Homestead…

Forecast by the National Weather Service for Homestead · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.9 mi 6.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Northeast 5th Street mile 2.8 directions to trailhead 1
  2. Parking at Northeast 5th Street mile 2.8 directions to trailhead 2
  3. Parking at Northeast 5th Street mile 2.9 directions to trailhead 3
  4. Parking at Northeast 5th Street mile 2.9 directions to trailhead 4
  5. Parking at Northeast 33rd Terrace mile 2.9 directions to trailhead 5
  6. Parking at Northeast 5th Street mile 2.9 directions to trailhead 6
  7. Parking at Northeast 5th Street mile 2.9 directions to trailhead 7
  8. Parking at Northeast 33rd Terrace mile 3 directions to trailhead 8
  9. Parking at Northeast 33rd Terrace mile 3 directions to trailhead 9
Homestead, along the trail (opens in a new tab)
Homestead, along the trail · Photo: Daniel Schwen · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Biscayne-Everglades Greenway Trail is the paved first section of the Biscayne-Everglades Greenway, in Homestead, Miami-Dade County, Florida. The greenway is planned as a 42-mile loop for biking, walking and horseback riding between Biscayne National Park and Everglades National Park; when complete, it would be the first green trail linking two national parks in the United States. National Geographic reported in February 2023 that the first phase would open on March 11, 2023, and that the whole path was estimated to cost $50 million, to be paid from a range of government grants. National Geographic called that first phase five miles long; TrailLink and 100 Florida Trails give 3.2 miles of paved trail.

The paved section runs east from East Mowry Drive along the C-103 canal, on South Florida Water Management District right-of-way, winding between subdivisions to an eastern end that TrailLink gives as Tallahassee Road and 100 Florida Trails as SW 137th Avenue. It passes under Florida's Turnpike and has several road crossings; near its eastern end it opens onto fields and tree nurseries and passes a lock. Beyond that point the greenway continues unpaved along the canal about 5 miles east to Biscayne National Park, by way of the C-103/Mowry Trail and the L-31E canal trail. The record's map line covers the paved section, about 3.9 miles in four pieces, plus a short separate piece farther east.

The trail is asphalt and almost entirely unshaded, and bicycles and electric bicycles may use it. There is no trailhead or parking directly on it; 100 Florida Trails points to Harris Field Park, about half a mile away by NE 12th Avenue and East Mowry Drive. In 2023, National Geographic reported a three-mile western section through downtown Homestead toward Everglades National Park as expected in about two years; its status could not be confirmed.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Homestead Gen Aviation Airport, 11.4 km from the trail's middle, 2 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F788082868891929291888279
Low °F555759636873747474706359
Precipitation, in1.7222.95.89.37.110.28.65.92.32
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1950 Homestead sheet (1:24,000); the 1956 Homestead sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. An ambitious new Florida trail links two U.S. national parks — National Geographic (February 6, 2023) · web · checked Oct 16, 2026
    Supports: 42-mile biking, walking and equestrian loop; first green trail linking two US national parks; first phase launching March 11, 2023, described as five miles; $50 million estimated cost from government grants; three-mile western section through downtown Homestead toward Everglades National Park expected in two years
  3. Biscayne-Everglades Greenway — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026
    Supports: Section 1 open, 3.2 miles from E. Mowry Dr. to Tallahassee Rd.; asphalt; South Florida Water Management District right-of-way alongside canals between subdivisions; bikes and electric bikes allowed; no direct parking along the trail
  4. Biscayne-Everglades Greenway — 100 Florida Trails (February 2025 update) · web · checked Oct 16, 2026
    Supports: 3.2-mile paved section from East Mowry Drive to SW 137 Avenue along the C-103 canal; passes under Florida's Turnpike; fields, nurseries and a lock near SW 137 Ave.; several road crossings; unpaved continuation about 5 miles east to Biscayne National Park via the C-103/Mowry Trail and L-31E canal trail; almost completely unshaded; no dedicated trailheads; parking at Harris Field Park about half a mile away via NE 12th Ave. and E. Mowry Dr.
  5. Way: Biscayne-Everglades Greenway Trail (1268288995) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: record's mapped length of about 3.9 miles in four pieces plus a short eastern piece; highway=cycleway, asphalt

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.