States › North Carolina

Blue Heron Trail

Greenway in North Carolina · OpenStreetMap relation

Runs through Bermuda Run · Davie County

Conditions now

Loading the weather near Bermuda Run…

Forecast by the National Weather Service for Bermuda Run · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Town of Burmuda Run.

Length
1.3 mi 2.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Win-Mock Farm Dairy, beside the trail (opens in a new tab)
Win-Mock Farm Dairy, beside the trail · Photo: Rufous-crowned Sparrow · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Blue Heron Trail is a multi-use path of the Town of Bermuda Run in Davie County, North Carolina, built in phases. The town dedicated the trail in July 2023 with two ribbon-cuttings on the same day, one along U.S. 158 at the pedestrian bridge and one at the Interstate 40 tunnel in the Kinderton Village area. A 2023 bill in the North Carolina House proposed a $5.9 million directed grant to the town that listed Phases II and III of the trail among its uses; the bill was referred to committee.

Phase II opened in late March 2025 with a ribbon-cutting at the I-40 pedestrian bridge, which the town replaced in partnership with the N.C. Department of Transportation during the widening of I-40; the older bridge had long been part of the Bahnson family farm. That phase connects to the Truist Sports Park playground, NC Fusion soccer fields and RISE Indoor Sports. In April 2025 the town dedicated the Flags at the Blue Heron Trail plaza at the U.S. 158 roundabout in front of WinMock at Kinderton.

This record maps about 1.3 miles of the trail, mostly asphalt and concrete, much of it lit, with a truss bridge named Berts Way Bridge, an underpass, and one gravel segment. OpenStreetMap notes that disconnected segments remain while the phases are built.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Yadkinville 6 E, 17.4 km from the trail's middle, 36 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485260707684878579706051
Low °F252734425261666458453428
Precipitation, in3.73.13.94.144.34.64.44.13.43.23.8
Snow, in2.71.90.5000000001.9
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Winston-Salem sheet (1:250,000); the 1968 Clemmons sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14956446, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. H 95: Funds Bermuda Run Projects — UNC School of Government Legislative Reporting Service · organization · checked Oct 17, 2026
    Supports: 2023 House Bill 95, $5.9 million directed grant to the Town of Bermuda Run, Phases II and III of the Blue Heron Trail, referred to Appropriations committee
  3. Flags project the latest in dedication ceremonies — Clemmons Courier (May 8, 2025) · web · checked Oct 17, 2026
    Supports: July 2023 dedication with two ribbon-cuttings (U.S. 158 pedestrian bridge, I-40 tunnel in Kinderton Village), Phase II opened late March 2025, NCDOT bridge replacement, Bahnson farm, connections, Flags at the Blue Heron Trail dedicated April 22, 2025 at U.S. 158 roundabout in front of WinMock at Kinderton
  4. Town plans ribbon-cutting for Phase II of Blue Heron Trail — Clemmons Courier (March 20, 2025) · web · checked Oct 17, 2026
    Supports: Phase II ribbon-cutting at I-40 pedestrian bridge, partnership with NCDOT during I-40 widening, connections to Truist Sports Park playground, NC Fusion soccer parks and RISE Indoor Sports
  5. OpenStreetMap relation 14956446 (Blue Heron Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: mapped length, asphalt and concrete surfaces, lighting, Berts Way Bridge (truss), tunnel, gravel segment, note on disconnected segments during phased construction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.