Blue Star Trail
Greenway in Michigan
Runs through Saugatuck Township, Saugatuck and Douglas · Allegan County
Conditions now
Loading the weather near Saugatuck…
Forecast by the National Weather Service for Saugatuck · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Blue Star Highway mile 0.2 directions to trailhead 1
- Parking at North Washington Street mile 1.4 directions to trailhead 2
- Parking at Lake Street mile 1.6 directions to trailhead 3
- Parking at West Center Street mile 1.8 directions to trailhead 4
- Parking at Saint Peter's Drive mile 1.8 directions to trailhead 5
- Parking at West Center Street mile 1.9 directions to trailhead 6
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Blue Star Trail is a paved, non-motorized path for walking, running and cycling. Saugatuck Township lists the existing path under its Parks and Recreation department, which is working with Friends of the Blue Star Trail, the City of Saugatuck and the Village of Douglas on extensions. Friends of the Blue Star Trail describe the full trail as a 20-mile off-road path mainly alongside Blue Star Highway, linking South Haven and Saugatuck and continuing beyond them, and say municipalities will own the sections within their borders.
Planned connections include the Kal-Haven Trail, the Van Buren Trail and the Beeline Trail north to Holland, with a long-term goal of a continuous trail from Holland to South Haven. The township lists two extensions in progress: a north extension from Amelanchier Park at Riverside Cemetery to the Blue Star Bridge over the Kalamazoo River, and a south extension from Wiley Road in Douglas to M-89. A township release of December 22, 2023 described the north section as over four miles when complete, to join existing paths at Old Allegan Road and beside Holland Avenue, with bidding planned for 2024. The record here covers about 1.5 miles.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Holland Tulip City Airport, 12.9 km from the trail's middle, 17 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 34 44 57 69 78 82 80 74 61 48 37 Low °F 20 20 28 37 48 58 62 60 52 43 34 26 Precipitation, in 1.9 1.8 2.1 3.5 3.8 3.5 2.8 3.1 3 4.2 3.2 2.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1928 Fennville sheet (1:62,500); the 1958 Racine sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Blue Star Trail
- Agency noticesBlue Star Trail - Saugatuck Township
Nearby trails
- Beeline Trail 0.3 mi away · 8.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Blue Star Trail - Saugatuck Township · government source · checked Oct 17, 2026 Supports: paved non-motorized path, Parks and Recreation, two extensions, partners, Holland to South Haven goal
- DNR Recommends TWP Blue Star Trail Grant Approval - Saugatuck Township · government source · checked Oct 17, 2026 Supports: December 22, 2023 release, north section over four miles, connections, bidding in 2024
- Your Trail - Friends of the Blue Star Trail · organization · checked Oct 17, 2026 Supports: 20-mile paved path, route along Blue Star Highway, planned connections, ownership by municipalities
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.