States › Michigan

Border to Border Trail

Greenway in Michigan

Runs through Lyndon Township, Sylvan Township (Washtenaw County) and Chelsea · Washtenaw County

Conditions now

Loading the weather near Chelsea…

Forecast by the National Weather Service for Chelsea · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Border-to-Border (B2B) Trail is a partially constructed non-motorized trail system in Washtenaw County, Michigan. The system is planned to cover approximately 55 miles (89 km) across Washtenaw County, along the Huron River.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
7.8 mi 12.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Sibley Road mile 0.1 · restrooms directions to trailhead 1
  2. Parking at Sibley Road mile 0.1 · restrooms directions to trailhead 2
  3. Parking at F A Weber Drive mile 0.4 · water directions to trailhead 3
  4. Parking at North Main Street mile 1 directions to trailhead 4
  5. Parking at Stockbridge Chelsea Road mile 1.4 directions to trailhead 5
  6. Parking at Stockbridge Chelsea Road mile 2.7 directions to trailhead 6
  7. Parking at Stockbridge Chelsea Road mile 5.6 · restrooms · water directions to trailhead 7
  8. Parking at Stockbridge Chelsea Road mile 5.6 · restrooms · water directions to trailhead 8
  9. Parking at Stockbridge Chelsea Road mile 5.6 · restrooms · water directions to trailhead 9
  10. Parking at North Territorial Road mile 6 · restrooms · water directions to trailhead 10
  11. Parking at North Territorial Road mile 6 · restrooms · water directions to trailhead 11
  12. Parking at Roepke Road mile 6.4 directions to trailhead 12
Bike Trail Bordering the EMU West Campus, Ypsilanti, Michigan.JPG (opens in a new tab)
Bike Trail Bordering the EMU West Campus, Ypsilanti, Michigan.JPG · Photo: Dwight Burdette · CC BY 3.0 · Wikimedia Commons

About this trail

This record maps about 7.8 miles of the Border-to-Border (B2B) Trail, the Washtenaw County, Michigan, trail overseen by Washtenaw County Parks & Recreation and the Huron Waterloo Pathways Initiative, on its branch north from Chelsea toward the county line. A 2.6-mile segment from Werkner Road and M-52 to the DNR's Green Lake Campground opened in December 2018. In 2020 a 2.1-mile segment carried it on to North Territorial Road, with a 50-space trailhead beside Lyndon Township Hall and a tunnel under M-52 at Green Lake. In October 2022 a section from Chelsea's Timbertown Park to Werkner Road completed a 6.3-mile path from Chelsea; 1.5 more miles to Boyce Road were planned for 2023.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chelsea, 5.3 km from the trail's middle, 19 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444587079828074614736
Low °F161725374856615951403123
Precipitation, in2.422.233.83.63.53.62.73.12.62.1
Snow, in10.98.64.70.90000001.86
Old maps

USGS topographic maps of the trail's middle go back to the 1919 Stockbridge sheet (1:62,500); the 1942 Stockbridge sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

2 Reddit threads about this trail, Aug 2024 to May 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Border-to-Border Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q4944522, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. 2.6 New B2B Miles Open on December 8! — Border to Border Trail (November 30, 2018) · organization · checked Oct 15, 2026
    Supports: 2.6-mile segment from Werkner Road and M-52 north of Chelsea to the DNR's Green Lake Campground entrance; HWPI and WCPARC
  6. New B2B Trail Segment Officially Open — Border to Border Trail (December 11, 2018) · organization · checked Oct 15, 2026
    Supports: segment opened with a December 2018 ribbon cutting
  7. 2020 – A Year of Trail Growth — Border to Border Trail (December 30, 2020) · organization · checked Oct 15, 2026
    Supports: 2.1-mile segment from Green Lake Campground to North Territorial Road; 50-space trailhead near North Territorial Road and M-52 by Lyndon Township Hall; M-52 tunnel at Green Lake
  8. New B2B Segment Completes Pathway — Chelsea Area Chamber of Commerce (November 8, 2022) · web · checked Oct 15, 2026
    Supports: Timbertown Park to Werkner Road section opened October 26; overseen by Washtenaw County Parks & Rec and HWPI; 6.3-mile path from Chelsea to Lyndon Township Hall; 2023 plan to extend 1.5 miles north to Boyce Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.