States › Michigan

Boyne City to Charlevoix Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Hayes Township (Charlevoix County), Horton Bay, Bay Township, Evangeline Township and Boyne City · Charlevoix County

Conditions now

Loading the weather near Horton Bay…

Forecast by the National Weather Service for Horton Bay · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.6 mi 12.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Park Drive mile 1 directions to trailhead 1
Evangeline Township, along the trail (opens in a new tab)
Evangeline Township, along the trail · Photo: Notorious4life (talk) (Uploads) · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Boyne City to Charlevoix Trail is a paved, non-motorized trail being built in phases between Boyne City and Charlevoix in Charlevoix County, Michigan. Planned at about 14.36 miles and 10 feet wide, it runs mostly apart from Boyne City Road. The Charlevoix County Trail Team and the Top of Michigan Trails Council lead the project; by the council's latest count about 8.37 miles were complete, with roughly 6 miles left to build.

Phase 1, completed in 2016, runs 3.2 miles from West Michigan Avenue and Boyne City Road in Boyne City through Young State Park to North Springwater Beach Road at the Evangeline–Bay township line. Phase 3, a 2.36-mile segment finished in spring 2025, continues from there along the Lake Charlevoix side of the road through Bay Township into the village of Horton Bay, where Lake Street leads to a public beach. At the north end, Phase 2, built in 2017, runs 2.97 miles from the Little Traverse Wheelway east of Waller Road in Hayes Township, across US 31 and along Boyne City Road on the Susan Lake side to Quarterline Road, with a spur to Eastern Avenue and a public Lake Charlevoix access with a picnic area and swimming beach.

The gap between Quarterline Road and Horton Bay is planned as a final phase: 2.69 miles to Hayes Township Park (formerly Camp Sea-Gull), where a trailhead is planned, then 3.3 miles to Pincherry Road in Bay Township. The council is bundling these miles into one engineering plan, and in 2024 fundraising was under way with no groundbreaking date set. The surface is asphalt. Walking, biking, skating and skiing are allowed; snowmobiles and horses are not.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Petoskey, 12.4 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F272837486170757569564434
Low °F151420324353595951413223
Precipitation, in2.41.71.92.93.12.92.53.23.54.532.4
Snow, in39.327.212.24.50.100000.39.430.6
Old maps

USGS topographic maps of the trail's middle go back to the 1955 Cheboygan sheet (1:250,000); the 1958 Bayshore sheet (1:62,500) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13365068, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan's Natural Shorelines — Hayes Township, Charlevoix, Michigan · government source · checked Oct 15, 2026
    Supports: paved, 10 feet wide, about 14 miles, mostly detached from Boyne City Road; five phases; Phase 2 route east of Waller Road, across US-31, Susan Lake side of Boyne City Road; Charlevoix County involvement; permitted uses (walk, bike, skate, ski); no snowmobiles or horses
  3. Boyne City to Charlevoix Trail — Top of Michigan Trails Council · organization · checked Oct 15, 2026
    Supports: 14.36 miles planned, 8.37 complete, about 6 left; asphalt; partners Charlevoix County Trail Team and Top of Michigan Trails Council; Phase 1 2016, 3.2 miles, W. Michigan Ave./Boyne City Road through Young State Park to N. Springwater Beach Road at the Evangeline/Bay township line; Phase 2 2017, 2.97 miles, Wheelway to Quarterline Road, Eastern Avenue spur and beach; Phase 3 completed spring 2025 into Horton Bay, Lake Street beach; final phase 2.69 miles to Hayes Township Park (former Camp Sea-Gull) and 3.3 miles to Pincherry Road, bundled into one engineering plan
  4. Blazing the Boyne City to Charlevoix Trail — Northern Express, April 27, 2024 · press · checked Oct 15, 2026
    Supports: Phase 3 is 2.36 miles from the north end of Springwater Beach Road along the Lake Charlevoix side through Bay Township; remaining phases more than 6 miles; fundraising under way with no firm groundbreaking dates (2024)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.