Brooke Pioneer Trail

Greenway in West Virginia · OpenStreetMap relation

Runs through Beech Bottom · Brooke County

Conditions now

Loading the weather near Beech Bottom…

Forecast by the National Weather Service for Beech Bottom · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.0 mi 11.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Wellsburg, along the trail (opens in a new tab)
Wellsburg, along the trail · Photo: Taber Andrew Bain from Richmond, VA, USA · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Brooke Pioneer Trail is a paved rail-trail along the east bank of the Ohio River in Brooke County, West Virginia, between Wellsburg and the Ohio County line at Short Creek, where it continues as the Wheeling Heritage Trails; together the two give about 18 miles of paved trail. The West Virginia Rails-to-Trails Council lists the Brooke Pioneer Trail Association as the trail's organization, and the Brooke County Commission has overseen its repairs. The corridor was the Panhandle Railroad's Wheeling Secondary Track between Weirton Junction Tower and Benwood, which opened in 1878, carried passengers until 1951 and freight until 1981, and had its tracks pulled in 1987; trail construction began about a decade later.

The trail begins at Charles and Second streets in Wellsburg, where it meets the Wellsburg Yankee Trail on the same corridor. South of town it crosses Buffalo Creek on a restored railroad trestle alongside State Route 2, and for its whole length it runs between the highway and the river, past manufacturing sites between Wellsburg and Windsor Heights and across from the Cardinal Power Plant in Ohio. Interpretive signs describe the railroad's history. It ends at Route 2 and Stone Shannon Road at Short Creek. Parking is just south of the Wellsburg trestle, in Beech Bottom (limited) and at Stone Shannon Road in Windsor Heights. A new Ohio River bridge from Brilliant, Ohio, landing about a mile south of Wellsburg, carries a bicycle path that links to the trail.

Flooding in February 2018 damaged the trail, and in April 2019 FEMA awarded $2,240,543 for repairs. The trail was then closed for more than two years while the bridge contractor used it; in September 2024 the county reported the slip repairs finished and the trail reopened. In July 2026 a $200,000 maintenance building, paid for with county coal severance funds, was nearing completion in Beech Bottom.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

45% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pike Island(Lock & Dam), 9.9 km from the trail's middle, 7 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374049627280838276655242
Low °F222330405060646357453528
Precipitation, in3.22.53.43.544.53.73.93.62.82.93.2
Snow, in5.34.42.60.10000000.22.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1902 Wheeling sheet (1:62,500); the 1957 Tiltonsville sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5601028, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Capito, Manchin Announce $2.2 Million for Repairs to Brooke Pioneer Trail — U.S. Senator Shelley Moore Capito (April 25, 2019) · government source · checked Oct 14, 2026
    Supports: FEMA grant of $2,240,543 for flood damage from February 2018; trail along the Ohio River from Wellsburg toward Wheeling
  3. Brooke Pioneer Rail Trail — West Virginia Rails-to-Trails Council · organization · checked Oct 14, 2026
    Supports: east bank of the Ohio River from Wellsburg to the Brooke-Ohio county line at Short Creek; continues as Wheeling Heritage Trails; 18 miles combined, paved; Panhandle Railroad, Wheeling Secondary Track, Weirton Junction Tower to Benwood, opened 1878, passengers to 1951, freight to 1981, tracks pulled 1987, construction a decade later; interpretive signs; Wellsburg Yankee Trail connection; Buffalo Creek trestle by SR 2; between road and river; manufacturing sites, Cardinal Power Plant; endpoints Charles St. and 2nd St. and SR 2 at Stone Shannon Rd.; parking; Brooke Pioneer Trail Association
  4. Commission reports on Brooke County trail — Weirton Daily Times (September 25, 2024) · press · checked Oct 14, 2026
    Supports: Brooke County Commission update; slip repairs completed and trail reopened; FEMA grant; closed more than two years while Flatiron Construction used it for the new Ohio River bridge; bridge from Brilliant to Route 2 about a mile south of Wellsburg with a bicycle path linking to the trail
  5. Coal severance funds power $200K maintenance hub for Brooke Pioneer Trail — WTOV9 (July 10, 2026) · web · checked Oct 14, 2026
    Supports: $200,000 maintenance building in Beech Bottom funded by Brooke County coal severance funds, expected complete within weeks

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.