States › Missouri

Brush Creek Trail

Greenway in Missouri

Runs through Parkville and Kansas City · Platte and Jackson counties

Conditions now

Loading the weather near Parkville…

Forecast by the National Weather Service for Parkville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.8 mi 7.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Elizabeth Street mile 2.6 directions to trailhead 1
  2. Parking at Elizabeth Street mile 2.6 directions to trailhead 2
  3. Parking at Emanuel Cleaver II Boulevard directions to trailhead 3
  4. Parking at East 39th Street directions to trailhead 4
  5. Parking at Elmwood Avenue directions to trailhead 5
This bit of trail and the trail bridge behind it is part of the connection between Kansas City, Missouri's Brush Creek Trail and Blue River Trail. The Rock Island Trail will also connect near here, so from this point you'll be able to make a trail connect (opens in a new tab)
This bit of trail and the trail bridge behind it is part of the connection between Kansas City, Missouri's Brush Creek Trail and Blue River Trail. The Rock Island Trail will also connect near here, so from this point you'll be able to make a trail connect · Photo: MoBikeFed · CC BY · Flickr

About this trail

This Brush Creek Trail record joins two separate trails in the Kansas City area of Missouri that share the name, about 17 miles apart: the Brush Creek Trail in Parkville, in Platte County, and the eastern end of Kansas City's Brush Creek Greenway Trail. Each follows a different stream called Brush Creek.

The Parkville trail, about 2 miles long, opened on November 3, 2023. It was opened by Platte County Parks & Recreation, whose projects are paid for by the county's voter-approved parks and stormwater sales tax, and the City of Parkville operates and maintains it. Its trailhead is at 15500 NW River Road. The 0.7-mile Thousand Oaks Connector, with a pedestrian bridge over Brush Creek and a trailhead at 6010 North Nevada Avenue, opened on October 2, 2025, and the county plans to link the trail to the Southern Platte Pass Trail. About 2.7 miles of the mapped route are in Parkville.

In Kansas City, Kansas City Parks & Recreation lists the Brush Creek Greenway Trail as 4.63 miles of concrete along the north side of Brush Creek, from Roanoke Parkway to the Blue River, and 2.17 miles on the south side from Roanoke Parkway to Euclid Avenue. The creek, 10.5 miles long, rises in Overland Park, Kansas, and joins the Blue River in Kansas City; in September 1977 it flooded the Country Club Plaza with 5 to 6 feet of water, and 25 people died. The south-side trail connects to the Trolley Track Trail at Volker Boulevard and 49th Street. Only about 2 miles of the greenway, near its eastern end along Emanuel Cleaver II Boulevard toward the Blue River, are mapped in this record.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kansas City Downtown Airport, 16.2 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404557677686908980685444
Low °F222636465767727061493627
Precipitation, in11.52.13.95.15.34.44.73.83.21.81.3
Snow, in3.43.20.40.1000000.30.13.5
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Kansas City sheet (1:125,000); the 1951 Wolcott sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Brush Creek Greenway Trail — Kansas City Parks & Recreation · organization · checked Oct 15, 2026
    Supports: north side Roanoke Pkwy to the Blue River 4.63 miles, concrete; south side Roanoke Pkwy to Euclid Ave. 2.17 miles, concrete
  3. Brush Creek (Blue River tributary) — Wikipedia · organization · checked Oct 15, 2026
    Supports: 10.5-mile stream from Overland Park, Kansas, to the Blue River in Kansas City; September 1977 flood of the Plaza with 5 to 6 feet of water; 25 deaths
  4. Brush Creek Trail | Platte County Parks & Recreation · web · checked Oct 15, 2026
    Supports: 2-mile Brush Creek Trail; trailhead 15500 NW River Road, Parkville; opened November 3, 2023; City of Parkville operates and maintains; parks/stormwater sales tax; link to the Southern Platte Pass Trail; Thousand Oaks Connector 0.7 mile with one pedestrian bridge over Brush Creek, opened October 2, 2025, trailhead 6010 N. Nevada Ave.
  5. Brush Creek Trail newest addition to county's network — The Platte County Landmark · web · checked Oct 15, 2026
    Supports: Platte County Parks Department opened the trail with a Nov. 3 ribbon-cutting; voter-approved parks/stormwater sales tax funds such projects
  6. Brush Creek Trail (MO) | Missouri Trails | TrailLink · web · checked Oct 15, 2026
    Supports: connection to the Harry Wiggins Trolley Track Trail at Volker Boulevard and 49th Street from the southern segment
  7. OpenStreetMap ways for this trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: record geometry: about 2.7 miles near NW River Road in Parkville and about 2 miles along Emanuel Cleaver II Boulevard to the Blue River in Kansas City, some 17 miles apart

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.