Bubble Gum Rail Trail
Rail-trail in South Carolina · OpenStreetMap relation
Runs through Belton · Anderson County
Conditions now
Loading the weather near Belton…
Forecast by the National Weather Service for Belton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Main Street mile 0 directions to trailhead 1
(opens in a new tab) About this trail
The Bubble Gum Rail Trail, also called the Belton Rail Trail, is a paved rail-trail in Belton, South Carolina, built on an abandoned railroad line along North Main Street and Highway 20. It was built in three phases over about three years and was dedicated in May 2021. The Belton Alliance described it as a project of nearly $800,000, paid for with donations, private grants and State of South Carolina grants. The City of Belton is a partner in its Kids in Parks TRACK Trail. The name comes from a conductor who, while the tracks were still in use, tossed pieces of bubble gum to children gathered beside them.
The trail starts at the Belton Library at 91 Breazeale Street, runs through downtown Belton and heads north toward Leda Poore Park, the northern trailhead, which the third phase reached. That phase added a bridge over a railroad bed, which carries the trail over the tracks north of Calhoun Road, and an underpass beneath North Main Street. The second phase extended the trail and added lighting. This record maps about 1.3 miles; TrailLink gives 1.2 miles from the library to the park, and Kids in Parks lists 3.7 miles for the full out-and-back.
The surface is asphalt and concrete. Along the way are exercise equipment at two locations, lighting at night, benches, plantings, art panels made by Belton-Honea Path High School students, artwork under the bridge, a playground and signs on the history of the rail line. Parking is at the library and at Leda Poore Park.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Anderson, 15.1 km from the trail's middle, 24 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 64 73 80 88 91 89 84 74 64 55 Low °F 32 35 41 49 59 67 71 70 64 52 41 35 Precipitation, in 4.6 4.4 4.8 4.1 3.6 4.2 3.8 4.8 3.8 3.3 4 5 Snow, in 0.2 0.3 0.2 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Greenville sheet (1:250,000); the 1957 Williamston sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12792128, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Belton's Rail Trail completed after three-year construction, brings more foot traffic downtown — WSPA 7NEWS (May 14, 2021) · web · checked Oct 16, 2026 Supports: abandoned railroad along North Main Street and Highway 20; three phases over about three years; dedication on May 20, 2021 at the library trailhead; nearly $800,000 with donations, private grants and state grants (Belton Alliance); phase 2 extension and lighting; phase 3 bridge over a railroad bed and underpass under North Main Street; library to Leda Poore Park; exercise equipment at two locations, lighting, benches, plantings, student art panels
- Bubble Gum Rail Trail Mini — Kids in Parks · web · checked Oct 16, 2026 Supports: name origin (conductor tossing bubble gum); 3.7-mile paved out-and-back; starts at the library and runs through downtown Belton; workout stations, artwork under the bridge, playground, history signs; City of Belton among TRACK Trail partners; 91 Breazeale St
- Bubble Gum Rail Trail - Mini — SC Trails · web · checked Oct 16, 2026 Supports: paved; walking and biking; former working train tracks; starting address 91 Breazeale St, Belton
- Bubble Gum Rail Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026 Supports: also known as the Belton Rail Trail; 1.2 miles from the Belton Library to Leda Poore Park; asphalt and concrete; heads north; Leda Poore Park as the northern trailhead reached by the third phase; bridge over the tracks north of Calhoun Road; parking at the library and Leda Poore Park
- Bubble Gum Rail Trail (relation 12792128) — OpenStreetMap · web · checked Oct 16, 2026 Supports: record length of about 1.3 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.