Buffalo Creek Greenway
Greenway in North Carolina
Runs through Smithfield · Johnston County
Conditions now
Loading the weather near Smithfield…
Forecast by the National Weather Service for Smithfield · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Church Street mile 0 directions to trailhead 1
(opens in a new tab) About this trail
The Buffalo Creek Greenway is a paved greenway of 2.94 miles in Smithfield, North Carolina. The Town of Smithfield describes it as a ten-foot path that forms the town's local part of the Mountains-to-Sea Trail, linking the historic downtown business district with the historic neighborhoods to the north and south, four town parks, two schools and the town's community and aquatics center. Johnston County's parks and open space program lists it as part of both the East Coast Greenway and the Mountains-to-Sea Trail. ABC11 reported the town's unveiling of the completed greenway, running from the downtown area to Smithfield Community Park.
The trail begins at the back of Smithfield Community Park and winds about three miles along Spring Branch to the Neuse Riverwalk at Smithfield Town Commons, where the county lists a greenway access at 295 North Front Street. According to the town, the full 2.94 miles have no at-grade road crossings. Structures include four pre-engineered steel bridges and 250 feet of boardwalk. Landowners gave easements or land at no cost, and about 1,800 feet of the greenway was built with State Trails funds from the North Carolina Department of Environment and Natural Resources.
The path is paved ten feet wide with two-foot stone shoulders, and the town lists five trailhead parking lots. The county gives its hours as dawn to dusk and lists picnic shelters, restrooms and a boat ramp at the downtown access. The record's map line is about 2.8 miles in two pieces in OpenStreetMap, from East Church Street near downtown northeast toward the community park, with parking mapped at East Church Street.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
62% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Smithfield, 0.4 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 57 64 74 81 88 92 89 84 74 64 57 Low °F 31 33 39 48 57 66 71 69 63 50 39 34 Precipitation, in 3.5 3.3 4 3.7 4.2 4.7 5.5 5.3 5.5 3.2 3.2 3.2 Snow, in 0.1 0 0 0 0 0 0 0 0 0 0 0.7 - On the National Register
- North Smithfield Historic District, Smithfield · historic district, listed 2000 · nomination file for North Smithfield Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Raleigh sheet (1:250,000); the 1964 Selma sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesBuffalo Creek Greenway (Town of Smithfield)
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Buffalo Creek Greenway — Johnston County Parks and Open Space Program · government source · checked Oct 16, 2026 Supports: part of the East Coast Greenway and Mountains to Sea Trail; access at 295 N Front St in downtown Smithfield; connects Smithfield Community Park and Town Commons Park; hours dawn to dusk; picnic shelters, restrooms, boat ramp
- Buffalo Creek Greenway — Town of Smithfield, North Carolina · web · checked Oct 16, 2026 Supports: 2.94 miles; ten feet wide, paved with 2-foot stone shoulders; local part of the Mountains-to-Sea Trail; links downtown business district, northern and southern historic neighborhoods, four town parks, two schools and the community/aquatics center; entrance at the back of Smithfield Community Park; about three miles along Spring Branch to the Neuse River Walk at Smithfield Town Commons; no at-grade road crossings; four pre-engineered steel bridges, 250 feet of boardwalk; easements and land donated at no cost; about 1,800 feet built with State Trails Funds (NCDENR); five trailhead parking lots
- New place to enjoy great outdoors in Smithfield — ABC11 Raleigh-Durham · web · checked Oct 16, 2026 Supports: unveiling of the completed greenway; runs from the downtown area to Smithfield Community Park
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: record's map line of about 2.8 miles in two pieces; parking mapped at East Church Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.