States › Michigan

Buffalo Ridge Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Traverse City and Garfield Township (Grand Traverse County) · Grand Traverse County

Conditions now

Loading the weather near Traverse City…

Forecast by the National Weather Service for Traverse City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Scenic Ridge Drive mile 0.4 directions to trailhead 1
  2. Parking at Scenic Ridge Drive mile 0.4 directions to trailhead 2
  3. Parking at Courtney Place mile 0.7 directions to trailhead 3
  4. Parking mile 1 directions to trailhead 4
  5. Parking at Franke Road mile 1.2 directions to trailhead 5
  6. Parking at Brook Drive mile 1.2 directions to trailhead 6
  7. Parking at Brook Drive mile 1.2 directions to trailhead 7
  8. Parking at Franke Road mile 1.3 directions to trailhead 8
  9. Parking at Franke Road mile 1.3 directions to trailhead 9
  10. Parking at Silver Drive mile 1.7 directions to trailhead 10
  11. Parking at Silver Drive mile 1.8 directions to trailhead 11
  12. Parking at Silver Drive mile 1.8 directions to trailhead 12
Traverse City, along the trail (opens in a new tab)
Traverse City, along the trail · Photo: Haem85 · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Buffalo Ridge Trail is a paved path of almost 1.5 miles on the west side of Traverse City, Michigan, part of the TART Trails network. The City of Traverse City owns and manages the part inside city limits and Garfield Township the part outside them; TART Trails works with both on trail projects.

The trail runs from The Village at Grand Traverse Commons past the TBA-ISD main office, Historic Barns Park and the Botanic Garden to Traverse City West Middle School and the YMCA, with stretches of boardwalk. Its second phase, an accessible segment of almost a mile linking West Middle School to the West YMCA near Kids Creek Park, was completed in September 2016. The trail belongs to a network between Silver Lake Road and US 37 that includes the Barns Trail, built by Garfield Township and the Joint Recreation Authority along Silver Lake Road, and a Safe Routes to School path between Wyatt and Barnes roads completed in 2012. Parking is on the west side of the Kohl's lot at Marketplace Circle.

TART Trails proposes a 4.5-mile trail in all, extending along Silver Lake Road from Creekside Drive to Zimmerman Road and on to East Silver Lake Park; in 2025 the extension was in preparation for conceptual design.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Traverse City Munson, 1.9 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283039526575797871574433
Low °F151421314253585750393022
Precipitation, in2.722.13.43.52.92.83.23.64.13.22.7
Snow, in32.321.412.34.7000000.15.624.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Traverse City sheet (1:250,000); the 1956 Kingsley sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1700808, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Buffalo Ridge Trail — TART Trails · organization · checked Oct 14, 2026
    Supports: almost 1.5 miles; boardwalk and paved; route from Grand Traverse Commons past TBA-ISD office, Historic Barns Park and Botanic Garden to West Middle School and YMCA; Phase II completed September 2016 near Kids Creek Park; network between Silver Lake Road and US-37; Barns Trail; Safe Routes path completed fall 2012; city and township ownership; parking at Marketplace Circle
  3. Buffalo Ridge Trail Project — TART Trails · organization · checked Oct 14, 2026
    Supports: nearly 1.5-mile paved pathway; city and Garfield Township jurisdiction; proposed extension along Silver Lake Road from Creekside Drive to Zimmerman Road and East Silver Lake Park; 4.5-mile proposed trail; 2025 status, preparations for conceptual design

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.