States › Michigan

Burt Lake Trail

Greenway in Michigan · OpenStreetMap relation

Runs through Brutus, Maple River Township, Munro Township, Burt Township (Cheboygan County) and Mullett Township · Emmet and Cheboygan counties

Conditions now

Loading the weather near Pellston…

Forecast by the National Weather Service for Pellston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.6 mi 12.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Crescent Street mile 0.1 directions to trailhead 1
  2. Parking at Brutus Road mile 13.8 directions to trailhead 2
  3. Parking at East Brutus Road mile 17.9 directions to trailhead 3
Mullett Township, Michigan (opens in a new tab)
Mullett Township, Michigan · Photo: Notorious4life (talk) (Uploads) · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Burt Lake Trail is a non-motorized trail for walkers, joggers and bicyclists in Burt Township, Cheboygan County, Michigan. The township's Burt Lake Trail Committee, which includes members from Mullett and Munro townships and the Top O' Michigan Trails Council, has built it in phases under a trail plan drawn up in September 2008, with grants from the Michigan Department of Transportation, the DNR Trust Fund and the Recreational Trails Program, private donations, and work with the Cheboygan County Road Commission.

Phase I, 5.1 miles along West Burt Lake Road with a trailhead at Brutus Road and Mundt Road, was completed in August 2013. Phase II, a 1.8-mile paved, separated trail completed in May 2020, runs from West Burt Lake Road near Hogsback Road through University of Michigan Biological Station land south of Riggsville Road, including a section known as the Gorge, to East Burt Lake Road. Phase III, 1.5 miles through the Biological Station forest to Birchwood Road, was completed on Oct. 13, 2021, giving 11.4 miles of continuous trail. Phases IV and V are 1.5-mile stretches of East Burt Lake Road (2020) and Mullett-Burt Road (2017) rebuilt with 5-foot paved shoulders.

In 2024 parts of Phase I were still gravel, and the township was paving sections as money allowed; its 2024 budget included paving half a mile of Phase I and the Gorge entrance. Two links remain planned: along Topinabee Mail Route east to the North Central State Trail at Topinabee, and along Brutus Road west to the North Western State Trail at Brutus. This record maps about 7.6 miles of the trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pellston Regional Airport, 8.7 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F272938526676797870574433
Low °F9716273848535244352718
Precipitation, in1.61.11.72.42.82.62.72.93.44.22.71.9
Old maps

USGS topographic maps of the trail's middle go back to the 1955 Cheboygan sheet (1:250,000); the 1957 Mullett Lake sheet (1:62,500) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 13365163, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Trail Committee — Burt Township · government source · checked Oct 15, 2026
    Supports: non-motorized trail for walkers, bikers and joggers; committee members from Mullett and Munro townships and Top O' Michigan Trails Council; trail plan of September 2008; MDOT, DNR Trust Fund and Recreational Trails Program grants and donations; Cheboygan County Road Commission; Phase I 5.1 miles completed August 2013, along West Burt Lake Road, trailhead at Brutus Road/Mundt Road, segments being blacktopped yearly; Phase II 1.8 miles paved separated trail completed end of May 2020 from West Burt Lake Road near Hogsback Road through UM Biological Station property south of Riggsville Road including the Gorge to East Burt Lake Road; Phase III 1.5 miles through the UM Biological Station forest to Birchwood and East Burt Lake Road completed Oct. 13, 2021, 11.4 continuous miles; Phases IV (East Burt Lake Road, 2020) and V (Mullett-Burt Road, 2017), each 1.5 miles with 5-foot paved shoulders; remaining sections Topinabee Mail Route to the North Central State Trail at Topinabee and Brutus Road to the Northwest State Trail at Brutus
  3. Burt Lake Trail Committee Minutes, April 29, 2024 — Burt Township · government source · checked Oct 15, 2026
    Supports: 2024 budget: maintenance including gravel application and brining the gravel part; improvements to pave half a mile of Phase I and the Gorge entrance

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.