Busse Road Trail
Greenway in Illinois · OpenStreetMap relation
Runs through Bensenville · DuPage County
Conditions now
Loading the weather near Bensenville…
Forecast by the National Weather Service for Bensenville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Busse Road mile 1.1 directions to trailhead 1
- Parking at Busse Road mile 1.3 directions to trailhead 2
- Parking at Busse Road mile 1.3 directions to trailhead 3
- Parking at Busse Road mile 1.4 directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
Busse Road Trail is a path of about 1.3 miles (2.1 km) in the BikeTheRail record, mapped in OpenStreetMap as a bicycle route relation named Busse Road Trail in Illinois. The relation is tagged as a local cycle network route and groups sixteen way segments, most of them cycleways with bicycles and pedestrians designated; several are signalized or marked road crossings, and the tagged segments that carry a surface are paved.
No page from a village, county or forest preserve describing the trail was found, so its manager, opening date and history are not known from the sources consulted. The name appears only in OpenStreetMap.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chicago Ohare International Airport, 2.6 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 36 47 59 70 80 84 82 76 63 48 37 Low °F 19 22 31 40 51 61 66 65 57 45 34 24 Precipitation, in 2 2 2.5 3.8 4.5 4.1 3.7 4.2 3.2 3.4 2.4 2.1 Snow, in 11.3 10.7 5.5 1.3 0 0 0 0 0 0.2 1.8 7.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Riverside sheet (1:62,500); the 1953 Elmhurst sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Elgin O'Hare Trail within 0.2 mi · 3.6 mi, surface unknown
- Salt Creek Greenway Trail 1.5 mi away · 5.1 mi, paved
- Busse Forest Trails Red Paved 2.4 mi away · 7.3 mi, paved
- Midland Trail 3.8 mi away · 2.4 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15984169, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- OpenStreetMap relation 15984169 (Busse Road Trail) · web · checked Oct 17, 2026 Supports: name, route=bicycle, network lcn, member count
- OpenStreetMap way 556163047 (member of Busse Road Trail) · web · checked Oct 17, 2026 Supports: cycleway, paved, bicycle and foot designated
- OpenStreetMap way 878430846 (member of Busse Road Trail) · web · checked Oct 17, 2026 Supports: signalized crossing segment
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.