Calais Waterfront Walkway
Rail-trail in Maine
Runs through Calais · Washington County
Conditions now
Loading the weather near Calais…
Forecast by the National Weather Service for Calais · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Main Street mile 1 directions to trailhead 1
- Parking at Main Street mile 1 directions to trailhead 2
- Parking at Salem Street mile 1.1 directions to trailhead 3
- Parking at Waterfront Park Way mile 1.1 directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Calais Waterfront Walkway is a gravel path of about 1.5 miles along the St. Croix River in downtown Calais, Maine, opposite St. Stephen, New Brunswick; this record maps about 1.7 miles. Maine Trail Finder lists the City of Calais as its manager and describes the walkway as following the route of the former Maine Central line. Calais is the northern end of the East Coast Greenway, which runs to Key West, Florida, and in 2012 the walkway between Salem Street and South Street, 0.67 mile, was counted among the greenway's off-road sections in Maine.
Calais was home to the first railroad built in Maine. The Calais Railroad, incorporated in 1832, was built to carry lumber 2 miles from a mill on the St. Croix River opposite Milltown, New Brunswick, to tidewater at Calais; it became the Calais and Baring Railroad in 1849 and part of the St. Croix and Penobscot Railroad in 1870. The Calais Branch of the Maine Central Railroad, built in 1898 to connect Brewer and Calais, carried passengers until 1957, and freight service ended on most of its western part in 1984; an isolated eastern section between St. Croix Junction and Milltown, with a connection into Canada, remains in operation.
The walkway follows the river from the library at Pikes Park, where the trailhead's paved lot is level with the trail, to Todd Street and South Street. It is about 6 feet wide and mostly level, and Maine Trail Finder describes it as accessible to a wide range of users, including wheelchair users; pets are permitted. The international bridge, about 100 yards away, links it to shoreline trails in St. Stephen.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Woodland, 9.9 km from the trail's middle, 31 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 28 31 39 52 64 74 80 79 71 58 46 35 Low °F 13 14 24 36 46 56 62 60 52 42 33 22 Precipitation, in 3.6 3.1 3.8 3.8 3.8 3.9 3.7 3.4 3.4 5.3 4.8 4.9 - On the National Register
- Calais Residential Historic District, Calais · historic district, listed 1994 · nomination file for Calais Residential Historic District
- Calais Historic District, Calais · historic district, listed 1978 · nomination file for Calais Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1929 Calais sheet (1:48,000); the 1949 Calais sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Calais, Maine — Wikipedia · organization · checked Oct 13, 2026 Supports: Calais Railroad incorporated 1832 as the first railroad in Maine, 2-mile lumber line from a mill opposite Milltown to tidewater, Calais and Baring Railroad 1849, St. Croix and Penobscot Railroad 1870, northern terminus of the East Coast Greenway at Key West
- Calais Branch — Wikipedia · organization · checked Oct 13, 2026 Supports: Maine Central Calais Branch from Brewer to Calais built 1898, passenger service ended 1957, freight ended on most of the western end 1984, eastern section between St. Croix Junction and Milltown still operating with a connection to Canada
- East Coast Greenway continues to evolve from Kittery to Calais — Bangor Daily News, August 29, 2012 · press · checked Oct 13, 2026 Supports: Calais Waterfront Walkway from Salem Street to South Street, 0.67 mile, listed among off-road ECG sections in Maine
- Calais Walkway — Maine Trail Finder · web · checked Oct 13, 2026 Supports: 1.5 miles, gravel/crushed stone, about 6 feet wide, mostly level, wheelchair accessible, route of the former Maine Central line, Pikes Park library to Todd and South streets, trailhead lot level with the trail, pets permitted, City of Calais as manager, St. Stephen trails via the international bridge about 100 yards away
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.