States › Michigan

Calhoun County Trailway

Greenway in Michigan · OpenStreetMap relation

Runs through Brownlee Park and Emmett Township (Calhoun County) · Calhoun County

Conditions now

Loading the weather near Brownlee Park…

Forecast by the National Weather Service for Brownlee Park · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
5.4 mi 8.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Kimball Pines Park Road mile 1.8 directions to trailhead 1
  2. Parking at Vernon Avenue mile 2.3 directions to trailhead 2
  3. Parking at Evanston mile 2.6 directions to trailhead 3
  4. Ott Biological Preserve Southeast Parking mile 2.7 directions to Ott Biological Preserve Southeast Parking
  5. Ott Biological Preserve Northwest Parking mile 4.4 directions to Ott Biological Preserve Northwest Parking
  6. Parking at North Raymond Road mile 5.5 directions to trailhead 6
Calhoun County Trailway drawn on the 1950 USGS topographic map of Battle Creek, Michigan
Then: the 1950 USGS Battle Creek sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Calhoun County Trailway is a 5.3-mile non-motorized trail in Emmett Township, Calhoun County, Michigan, with trailheads in Battle Creek. Calhoun County's parks department owns and manages it, while the Calhoun County Trailway Alliance raises the money to maintain it through an endowment held at the Battle Creek Community Foundation. The trail was built in 2014 along a parks corridor rather than a railroad, crossing open-space easements and county parkland. The county plans further sections that would carry the trailway across Calhoun County; in 2019 the Alliance described an extension of the Albion River Trail along the south side of Michigan Avenue in Albion as part of the Calhoun County Trailway and of a plan to link Marshall and Albion by trail.

The trail begins where the Battle Creek Linear Path ends and runs south through the Ott Biological Preserve and Kimball Pines County Park, then southeast to Historic Bridge Park. The county lists trailheads at 904 East Emmett Street, 410 Jameson Street, 1129 Olive Street, 1158 East Michigan Avenue and 14930 Wattles Road. The Ott Preserve has parking lots on Jameson Road and Arlington Road, and Historic Bridge Park serves the southern end.

TrailLink describes the trail as 10 feet wide with a crushed gravel surface and several elevated boardwalks. The county says it was built to ADA standards and suits pedestrians, wheelchairs and bicycles, but that natural slopes in places will make some sections difficult for many users.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

51% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Battle Creek Kellogg Airport, 10.4 km from the trail's middle, 8 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313445597079838174614736
Low °F171927374958626153423224
Precipitation, in1.61.21.72.93.73.43.43.43.23.52.11.4
Old maps

USGS topographic maps of the trail's middle go back to the 1918 Battle Creek sheet (1:62,500); the 1961 Ceresco sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9768489, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Calhoun County Trail — Calhoun County, MI Parks and Recreation · government source · checked Oct 15, 2026
    Supports: 5.3 miles, built 2014 along a parks corridor in Emmett Township, begins where the Battle Creek Linear Path ends, easements, Ott Preserve, Kimball Pines, ends at Historic Bridge Park, county ownership and management, Trailway Alliance endowment at the Battle Creek Community Foundation, future sections across the county, trailhead addresses, non-motorized, ADA, slopes
  3. Albion Receives Trail Grant from Marshall Community Foundation — Albion Michigan (by Mark Lelle, Calhoun County Trailway Alliance) · web · checked Oct 15, 2026
    Supports: Albion River Trail extension along the south side of Michigan Avenue as part of the Calhoun County Trailway and the plan to link Marshall and Albion
  4. Calhoun County Trailway — TrailLink · web · checked Oct 15, 2026
    Supports: 10-foot width, crushed gravel surface, elevated boardwalks, Ott Preserve parking on Jameson and Arlington roads, parking at Historic Bridge Park, TrailLink category Greenway/Non-RT

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.