States › Ohio

Camp Chase Trail

Rail-trail in Ohio · OpenStreetMap relation

Runs through Columbus · Madison and Franklin counties

Conditions now

Loading the weather near Columbus…

Forecast by the National Weather Service for Columbus · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Camp Chase Trail is a paved multi-use trail in Madison and Franklin counties in the U.S. state of Ohio. It serves as the Southwest Columbus segment of the 326-mile (525 km) Ohio to Erie Trail. The entire length of the Camp Chase Trail is part of the Great American Rail-Trail, U.S. Bicycle Route 21 and U.S. Bicycle Route 50.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
15.3 mi 24.6 km1
On former railbed
5.0 mi 33%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Alkire Road mile 5.2 · restrooms directions to trailhead 1
  2. Parking at Alkire Road mile 5.2 · restrooms directions to trailhead 2
  3. Parking mile 5.6 directions to trailhead 3
  4. Battelle Darby Creek Metro Park Trailhead mile 5.7 directions to Battelle Darby Creek Metro Park Trailhead
  5. Parking at Regentshire Drive mile 11.2 directions to trailhead 5
  6. Parking at Bear Drive mile 11.3 directions to trailhead 6
  7. Parking at Westview Court mile 11.6 directions to trailhead 7
  8. Parking at Countrybrook West Drive mile 11.6 directions to trailhead 8
  9. Parking at Brent Boulevard mile 11.6 directions to trailhead 9
  10. Parking at Countrybrook West Drive mile 11.7 directions to trailhead 10
  11. Parking at Countrybrook East Drive mile 11.8 directions to trailhead 11
  12. Parking at Northview Court mile 11.9 directions to trailhead 12
  13. Wilson Road Park (Trailhead) mile 13.3 directions to Wilson Road Park (Trailhead)
  14. Parking at Ranelle Drive mile 13.6 directions to trailhead 14
  15. Parking at Derrer Run Drive mile 13.7 directions to trailhead 15
  16. Parking at Derrer Road mile 13.7 directions to trailhead 16
  17. Parking mile 14.7 directions to trailhead 17
The start of the Camp Chase trail.jpg (opens in a new tab)
The start of the Camp Chase trail.jpg · Photo: SouthernNights · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Camp Chase Trail is a paved multi-use trail in Madison and Franklin counties, Ohio, running from Wilson Road in Madison County through Battelle Darby Creek Metro Park to the Hilltop neighborhood of Columbus. It is the southwest Columbus segment of the Ohio to Erie Trail and part of the Great American Rail-Trail, U.S. Bicycle Route 21 and U.S. Bicycle Route 50. Metro Parks manages the trail and gives 12.5 miles from Wilson Road to Sullivant Avenue; Wikipedia gives 15.2 miles to North Eureka Avenue, and this record maps 15.3. Rather than a former railroad, the trail runs beside the active Camp Chase Railway, which takes its name from the Civil War Union training camp and Confederate prison camp in Columbus; a Confederate cemetery with 2,260 graves remains.

Metro Parks worked with the Camp Chase Rail Company on an easement alongside the tracks, finalized in 2009. More than 12 miles of the 12-foot trail lie within the railroad right-of-way, separated from the tracks by fencing, grade separation and ditches. A trail bridge over Darby Creek opened into the park in March 2012, the section between Galloway Road and Sullivant Avenue, including a bridge over Interstate 270, opened in October 2015, and the City of Columbus completed paving from Georgesville Road to North Eureka Avenue on December 1, 2016. Metro Parks finished a 1-mile segment through the woods of Battelle Darby Creek in May 2020.

The western trailhead on Wilson Road, where the Roberts Pass Trail ends, has parking, benches, bike racks and a portable toilet. The trail leaves the rail corridor along Big Darby Creek in Battelle Darby Creek Metro Park, where a short connector is crushed limestone, and for about a mile along Georgesville Road in Columbus. The park, more than 7,060 acres, keeps bison on restored prairie. From North Eureka Avenue the Ohio to Erie Trail follows streets to the Hilltop Connector bridge and the Scioto Greenway Trail.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Columbus Ohio State Univ Airport, 20.8 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F364050637381848377655140
Low °F212331415160646254433426
Precipitation, in2.21.933.53.943.7332.52.42.5
Old maps

USGS topographic maps of the trail's middle go back to the 1923 West Columbus sheet (1:62,500); the 1955 Galloway sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 to 2026 named the crossings at Georgesville Road and Sullivant Avenue and the parking-lot stretch near the casino as the hard parts, saying drivers often did not yield. r/Columbus, Aug 2024 · r/Columbus, Jan 2025 · r/Columbus, Apr 2026
  • Riders in 2025 suggested starting at the Galloway sports complex, the Hilltop YMCA or lots at Georgesville and Sullivant rather than Wilson Road Park, calling the first miles out of the Hilltop uneasy. r/Columbus, Jan 2025
  • Several riders in 2024 to 2026 suggested starting at the Alkire Road lot in Battelle Darby Creek and riding west to London, describing a straight, uncrowded run with food stops in town. r/Columbus, Jul 2024 · r/Columbus, Jan 2025 · r/Columbus, Apr 2026
  • A 2024 rider noticed a slight climb heading away from the city and a fast return, while a 2026 rider called the Battelle Darby to London run completely flat. r/Columbus, Jul 2024 · r/Columbus, Apr 2026
22 Reddit threads about this trail, Mar 2024 to Apr 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2094196, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Camp Chase Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q16974218, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Camp Chase Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: Madison and Franklin counties; southwest Columbus segment of the Ohio to Erie Trail; Great American Rail-Trail, USBR 21 and USBR 50; named for the Camp Chase Railway and the Civil War camp; easement with the Camp Chase Rail Company finalized 2009; more than 12 miles within the railroad right-of-way; 12-foot width; fencing, grade separation and ditching; seven railroad crossings; Darby Creek bridge March 21, 2012; Galloway Road–Sullivant Avenue section with I-270 bridge October 2015; Georgesville Road–N. Eureka Ave. paved December 1, 2016 by Columbus; 1-mile Battelle Darby Creek woods segment May 2020; 15.2 miles; crushed limestone connector in the park; leaves the railway along Big Darby Creek and for a mile along Georgesville Road; Alkire Road parking; Wilson Road Park amenities; Ohio to Erie Trail on streets to the Hilltop Connector bridge and Scioto Greenway Trail
  5. Ohio's Camp Chase Trail — Rails to Trails Conservancy · organization · checked Oct 14, 2026
    Supports: trail follows an active railroad except for a short stint along Darby Creek
  6. Greenway Trails — Metro Parks (Columbus and Franklin County Metropolitan Park District) · web · checked Oct 14, 2026
    Supports: 12.5 miles paved from Wilson Road in Madison County through Battelle Darby Creek Metro Park to Sullivant Avenue; part of the Ohio to Erie Trail and US Bicycle Route 50; Metro Parks manages the trail
  7. Camp Chase Trail — Friends of Madison County Parks & Trails · web · checked Oct 14, 2026
    Supports: Wilson Road trailhead at the end of the Roberts Pass Trail with parking, benches, bike racks and porta-potty; Camp Chase history and 2,260-grave Confederate cemetery at 2900 Sullivant Ave.; Battelle Darby Creek Metro Park over 7,060 acres with restored prairie and bison

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.