States › Massachusetts

Canalside Rail Trail

Rail-trail in Massachusetts

Runs through Montague and Turners Falls · Franklin County

Conditions now

Loading the weather near Turners Falls…

Forecast by the National Weather Service for Turners Falls · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Canalside Rail Trail is a 3.8-mile (6.1 km) trail, partially on old railroad beds, from East Deerfield to Turners Falls in Montague, Massachusetts, US. A short portion of the trail runs along town streets, but the majority is on a paved trail from which motor vehicles are prohibited. The northern terminus is Unity Park, on Barton's Cove in Turners Falls. The southernmost portion crosses the Connecticut River on the Canalside Rail Trail Bridge and ends at McClelland Farm Road in Deerfield. The trail was completed in spring 2008.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
2.4 mi 3.8 km1
On former railbed
2.0 mi 82%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Migratory Way mile 0.9 directions to trailhead 1
  2. Parking at J Street mile 1.4 directions to trailhead 2
  3. Parking at Second Street mile 1.9 directions to trailhead 3
  4. Parking at First Street mile 2 directions to trailhead 4
  5. Parking at First Street mile 2 directions to trailhead 5
  6. Parking at First Street mile 2.1 directions to trailhead 6
  7. Parking at First Street mile 2.3 directions to trailhead 7
  8. Parking at First Street mile 2.4 directions to trailhead 8
  9. Parking at First Street mile 2.4 directions to trailhead 9

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Canalside Rail Trail, Turners Falls MA.jpg (opens in a new tab)
Canalside Rail Trail, Turners Falls MA.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Canalside Trail is the Montague part, about 2.4 miles, of the Canalside Rail Trail, a paved trail of 3.8 miles from East Deerfield to Turners Falls in Franklin County, Massachusetts, run by the Massachusetts Department of Conservation and Recreation. The trail lies partly on old railroad beds, among them the Turners Falls branch, a 9-mile line from South Deerfield to Turners Falls built by the New Haven and Northampton Railroad and later part of the New York, New Haven and Hartford Railroad. The Boston and Maine Railroad, which had its own branch to Turners Falls, acquired the line in 1947 and abandoned it in 1985. The trail was completed in spring 2008.

The northern end is Unity Park on Barton's Cove in Turners Falls. A short portion of the trail uses town streets; the rest is off-road and closed to motor vehicles. Southwest of Turners Falls the trail passes 11th Street and Depot Street, then crosses the Connecticut River to Deerfield on the Canalside Rail Trail Bridge and ends at McClelland Farm Road; the Deerfield end is mapped as a separate record, and the bridge itself is not yet mapped in either. The bridge was built in 1880 by the Keystone Bridge Company. In the 1936 flood the floating Montague City Covered Bridge knocked two of its three spans off their piers, and the Phoenix Bridge Company replaced them that year; the remaining 1880 Whipple truss span is the oldest surviving span across the Connecticut River. The bridge was refurbished in 2006 for the trail.

Maintenance by FirstLight on the Turners Falls Power Canal Dike has twice closed the section between 11th Street and Depot Street: from late August to late October 2024, with a detour along Montague City Road, and from May 12 to June 6, 2025, when DCR kept the rest of the trail open.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Greenfield #3, 4.3 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333745587078838174625040
Low °F151423344554595750392921
Precipitation, in3.53.13.93.844.84.14.74.24.73.84.7
Wildlife refuges

Passes beside Silvio O. Conte National Fish and Wildlife Refuge.

On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Greenfield sheet (1:62,500); the 1954 Greenfield sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Canalside Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q5031100, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. DCR Recreational Advisory: Canalside Rail Trail — Town of Montague (May 2025) · government source · checked Oct 13, 2026
    Supports: DCR closure of the Depot Street to 11th Street section May 12 to June 6, 2025, for FirstLight maintenance on the Turners Falls Power Canal Dike; rest of the trail open
  5. Canalside Rail Trail Detour — Town of Montague (August 2024) · government source · checked Oct 13, 2026
    Supports: closure between 11th Street and Depot Street late August to late October 2024, detour along Montague City Road
  6. Canalside Rail Trail — Wikipedia · organization · checked Oct 13, 2026
    Supports: 3.8 miles East Deerfield to Turners Falls, partly on railroad beds, short street portion, motor vehicles prohibited, Unity Park on Barton's Cove, bridge, McClelland Farm Road, completed spring 2008, DCR
  7. Turners Falls branch (New Haven) — Wikipedia · organization · checked Oct 13, 2026
    Supports: 9-mile branch South Deerfield to Turners Falls, New Haven and Northampton and New Haven ownership, B&M acquisition 1947, abandonment 1985, part now the Canalside Rail Trail
  8. Canalside Rail Trail Bridge — Wikipedia · organization · checked Oct 13, 2026
    Supports: 1880 Keystone Bridge Co. construction, 1936 flood damage and Phoenix Bridge Co. replacement spans, oldest surviving span across the Connecticut, Whipple truss, 2006 refurbishment

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.