Cannon Trail
Greenway in Michigan
Runs through Cannon Township and Cannonsburg · Kent County
Conditions now
Loading the weather near Cannonsburg…
Forecast by the National Weather Service for Cannonsburg · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Kreuter Road Northeast mile 2.9 directions to trailhead 1
- Parking at Ramsdell Drive Northeast mile 4.2 directions to trailhead 2
- Parking at Ramsdell Drive Northeast mile 4.3 · restrooms directions to trailhead 3
- Parking at 6 Mile Road Northeast mile 4.3 · restrooms directions to trailhead 4
(opens in a new tab) About this trail
The Cannon Trail is a paved path in Cannon Township, Kent County, Michigan. The township's Recreation Committee oversees its parks and trails, and the township describes its trail system as reaching Luton Park, where the Cannon Trail currently ends. The section between the Cannon Township Center and Townsend Park, about 4 miles long, is listed by TrailLink as the Cannon Township Trail. It is a greenway, not a railroad corridor.
From the township center at 6878 Belding Road NE, the route runs east along Belding Road, then turns south for most of its length through pine forest, meadows and wetlands. At the historic Cannonsburg Cemetery, at Sunfish Lake Avenue and Kreuter Road, it turns east again and ends at Townsend Park on Ramsdell Drive. The township center lot and Townsend Park, at 8280 Six Mile Road NE, are the trailheads; the trail enters the north end of the park, where a one-mile singletrack mountain bike loop begins.
The trail is paved, with two boardwalks over wetlands and a bridge over Armstrong Creek. Two extensions are planned. To the north, a section from Luton Park to Courtland, routed through Meadow Ridge Elementary School and Luton Park on easements approved by the Rockford school board and Kent County Parks, would complete a link toward Rockford that has been in the works for more than 25 years; the township planned to begin construction in summer 2026. To the south, the township plans to extend the trail from Cannonsburg Village to the Cannonsburg ski area to meet the Grand River Greenway, which is to run south along Pettis Avenue toward Ada and on toward Plainfield, Grand Rapids and the White Pine Trail. The township applied for a Michigan DNR Trust Fund grant for that work and hoped to begin engineering in 2026.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Grand Rapids, 20.4 km from the trail's middle, 28 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 70 79 83 81 74 61 47 36 Low °F 19 20 27 37 49 58 62 61 53 42 33 25 Precipitation, in 2.5 2.1 2.4 4 4 3.9 3.9 3.5 3.4 4 3.1 2.5 Snow, in 22.6 17.2 7.6 2 0 0 0 0 0 0.3 7.1 20.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Midland sheet (1:250,000); the 1958 Midland sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- White Pine Trail State Park 3.8 mi away · 96.0 mi, paved
- Pettis Avenue Non-Motorized Trail 4.5 mi away · 5.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Parks & Recreation — Cannon Township · government source · checked Oct 15, 2026 Supports: Recreation Committee oversees trails, trail currently ends at Luton Park, Luton Park-to-Courtland extension and easements, 25-year goal of linking Rockford and Ada, construction planned summer 2026, southern extension to the ski area and Grand River Greenway along Pettis Avenue, DNR Trust Fund grant application, engineering hoped for 2026, township office address
- Cannon Township Trail — TrailLink · web · checked Oct 15, 2026 Supports: 4 miles between the township center and Townsend Park, greenway, route along Belding Road and south past Cannonsburg Cemetery to Townsend Park on Ramsdell Drive, pine forest, meadows and wetlands, two boardwalks, Armstrong Creek bridge, trailheads and addresses, singletrack loop in Townsend Park
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.