CAP Trail
Greenway in Arizona
Runs through Red Rock (Pinal County) and Marana · Pinal and Pima counties
Conditions now
Loading the weather near Marana…
Forecast by the National Weather Service for Marana · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The CAP Trail is a recreation trail along the Central Arizona Project (CAP) canal, which runs 336 miles across Arizona. The Bureau of Reclamation planned a trail along the whole canal for walking, bicycling, jogging and equestrian use, and in 2003 the recreation trail along the canal was designated a National Recreation Trail by the Secretary of the Interior. The OpenStreetMap record maps about 15 miles of unpaved path along the canal.
The Central Arizona Project states that it does not build or maintain the trail: each sponsoring city, county or tribal agency handles its own portion, and CAP facilitates recreation agreements between the Bureau of Reclamation and those sponsors. The trail runs on an unfenced strip of land about twenty feet wide, and public motorized use is not allowed.
In Pinal County, the first segment approved for construction, the Park Link Segment, runs about 10.5 miles from the Pinal-Pima county line north toward Park Link Drive, mostly on the canal maintenance road, with a new trailhead on Nona Road. Reclamation designated it for pedestrians, equestrians and bicyclists only. Pinal County's plan divides its stretch of the trail into eleven segments.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Picacho 8 SE, 22.7 km from the trail's middle, 24 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 67 71 78 86 95 104 104 103 99 89 76 66 Low °F 41 43 48 54 63 72 78 78 72 60 49 40 Precipitation, in 1 1.1 0.9 0.3 0.2 0.2 1.3 1.9 0.9 0.5 0.5 1.1 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1934 Newman Peak sheet (1:125,000); the 1959 Tortolita Mts sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesCAP Trail - Central Arizona Project
- RedditSearch Reddit: r/arizona
Nearby trails
- Santa Cruz River Path 0.6 mi away · 13.1 mi, paved
- West Tangerine Road Paved Shared Use Path 4.4 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Finding of No Significant Impact, CAP Canal Trail: Pinal-Pima County Line to Park Link Drive - Bureau of Reclamation · government source · checked Oct 17, 2026 Supports: 336-mile canal, trail planned along whole canal, 2003 National Recreation Trail designation, Park Link Segment 10.5 miles, designated uses, eleven Pinal segments, Nona Road trailhead
- CAP Trail - Central Arizona Project · web · checked Oct 17, 2026 Supports: allowed uses, no motorized use, CAP does not build or maintain, sponsor partnerships, unfenced strip about twenty feet wide
- OpenStreetMap ways for this trail · web · checked Oct 17, 2026 Supports: mapped length about 15 miles, dirt surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.