Cape Fear River Trail
Greenway in North Carolina · OpenStreetMap relation
Runs through Fayetteville · Cumberland County
Conditions now
Loading the weather near Fayetteville…
Forecast by the National Weather Service for Fayetteville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- By trainAmtrak: Fayetteville, NC (FAY) 1.6 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Cape Fear River Trail is a paved multi-use trail through woods and wetlands along the Cape Fear River on the north side of Fayetteville, North Carolina. The City of Fayetteville held a groundbreaking ceremony for it in August 2006; the first phase, over four miles of bicycle and pedestrian greenway from Methodist College to Clark Park, was due to be finished the following spring. The trail is part of the East Coast Greenway.
TrailLink gives the trail as 7 miles between 498 Treetop Drive at the north end and the Riverside Dog Park at 555 North Eastern Boulevard at the south end, with parking at both ends and at Clark Park Nature Center, 631 Sherman Drive. Clark Park's trailhead is named for Moses Mathis, known locally as the "Bicycle Man" for his youth programs. Older descriptions give about 5.3 miles from the Jordan Soccer Complex to Clark Park; Great Runs described the stretch south of Clark Park as an extension to the dog park that connects to Cross Creek Linear Park, toward downtown. This record's map line, about 7.1 miles, runs from the northern end to the dog park.
The Distinctly Fayetteville visitor site describes a 10-foot-wide paved path with wooden bridges, including a covered bridge, and more than 1,000 feet of boardwalk through marsh and wetlands; interpretive signs describe more than 700 species of plants and trees and 150 species of birds along the route. TrailLink describes the route as relatively flat with some hills.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
66% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fayetteville (Pwc), 4.1 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 58 65 74 81 88 91 89 84 74 65 57 Low °F 32 33 40 48 58 67 71 69 63 51 40 34 Precipitation, in 3.4 3.2 3.6 3.5 3.4 4.8 5.7 5.2 4.9 3.3 3.4 3.5 Snow, in 0.6 0.3 0 0 0 0 0 0 0 0 0 0.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1948 Fayetteville sheet (1:62,500); the 1957 Vander sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Jan 2024 to Feb 2026
- Living Recs Around Ft Bragg, NC r/NorthCarolina · Feb 2026 · 20 comments
- Fayettville r/NorthCarolina · Jan 2024 · 87 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9723756, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Cape Fear River Trail — Fayetteville LocalWiki · organization · checked Oct 16, 2026 Supports: about 5.3 miles from Jordan Soccer Complex to Clark Park; planned extension to the Linear Park trail toward downtown
- Construction Starts On Cape Fear River Trail — WRAL (August 3, 2006) · web · checked Oct 16, 2026 Supports: City of Fayetteville ceremony starting construction; first phase over four miles from Methodist College to Clark Park; completion expected by spring
- 5 Spots to Train for Your Next Run — Distinctly Fayetteville · web · checked Oct 16, 2026 Supports: 10-foot-wide paved path; 5.3 miles one way; flat and hilly terrain; wooden bridges and a covered bridge; over 1,000 feet of boardwalk through marsh and wetlands; interpretive signs, 700 plant and tree species and 150 bird species; part of the East Coast Greenway; Tree Top Drive and Sherman Drive entrances
- Cape Fear River Trail — TrailLink (Rails to Trails Conservancy) · web · checked Oct 16, 2026 Supports: 7 miles; north side of Fayetteville; endpoints 498 Treetop Dr. and Riverside Dog Park, 555 N Eastern Blvd.; Clark Park Nature Center parking; Moses Mathis trailhead name; East Coast Greenway; relatively flat with some hills
- Cape Fear River Trail — Great Runs · web · checked Oct 16, 2026 Supports: southern extension to the Riverside Dog Park connecting to Cross Creek Linear Park; Clark Park access, 1.2 miles south and 5 miles north
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.