Capital Circle Trail
Greenway in Florida · OpenStreetMap relation
Runs through Tallahassee · Leon County
Conditions now
Loading the weather near Tallahassee…
Forecast by the National Weather Service for Tallahassee · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Capital Circle Southeast mile 0.9 · restrooms directions to trailhead 1
- Parking at Capital Circle Southeast mile 0.9 directions to trailhead 2
- Parking at Capital Circle Southeast mile 0.9 directions to trailhead 3
- Parking at Esplanade Way mile 4 directions to trailhead 4
- Parking at Capital Circle Southeast mile 4.4 directions to trailhead 5
- Parking at Drayton Drive mile 4.4 directions to trailhead 6
- Parking at Drayton Drive mile 4.5 directions to trailhead 7
- Parking at Drayton Drive mile 4.6 directions to trailhead 8
- Parking at Coolidge Court mile 4.8 directions to trailhead 9
- Parking at Blair Stone Road mile 4.9 directions to trailhead 10
- Parking at Capital Circle Southeast mile 4.9 directions to trailhead 11
- Parking at Coolidge Court mile 4.9 directions to trailhead 12
- Parking at Esplanade Way mile 5 directions to trailhead 13
- Parking at Blair Stone Road mile 5 directions to trailhead 14
- Parking at Capital Circle Southeast mile 5 directions to trailhead 15
- Parking at Capital Circle Southeast mile 5.1 directions to trailhead 16
- Parking at Esplanade Way mile 5.1 directions to trailhead 17
- Parking at Esplanade Way mile 5.1 directions to trailhead 18
- Parking at Capital Circle Southeast mile 5.1 directions to trailhead 19
- Parking at Esplanade Way mile 5.1 directions to trailhead 20
- Parking at Esplanade Way mile 5.1 directions to trailhead 21
- Parking at Esplanade Way mile 5.1 directions to trailhead 22
- Parking at Capital Circle Southeast mile 5.1 directions to trailhead 23
- Parking at Capital Circle Southeast mile 5.1 directions to trailhead 24
- Parking at Capital Circle Southeast mile 5.1 directions to trailhead 25
- Parking at Esplanade Way mile 5.1 directions to trailhead 26
- Parking at Capital Circle Southeast mile 5.2 directions to trailhead 27
- Parking at Capital Circle Southeast mile 5.2 directions to trailhead 28
- Parking at Capital Circle Southeast mile 5.3 directions to trailhead 29
- Parking at Capital Circle Southeast mile 5.3 directions to trailhead 30
- Parking at Capital Circle Southeast mile 5.3 directions to trailhead 31
- Parking at Capital Circle Southeast mile 5.3 directions to trailhead 32
- Parking at Capital Circle Southeast mile 5.3 directions to trailhead 33
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Capital Circle Trail is a paved path beside Capital Circle Southeast (US 319) on the southeast side of Tallahassee, Florida. It is a sidepath along the highway, not a rail-trail. Visit Tallahassee calls it the Capital Circle Southeast Trail or Capital Circle Connector and gives its length as 5.7 miles; this record, from OpenStreetMap, maps about 6 miles, where the route is tagged as a regional bicycle route.
OpenStreetMap places the trail from near Hill Lane south along Capital Circle Southeast and then west, crossing the Tallahassee-St. Marks Historic Railroad State Trail near that trail's northern trailhead. Visit Tallahassee describes it as starting as a concrete sidewalk and widening to a paved multi-use path 10 to 12 feet wide, ending at the St. Marks trail, with benches and nearby parking; a bike lane on US 319 is an alternative to the path. The Southwood Nature Trail and the Lafayette Heritage Trail lie nearby. The City of Tallahassee and Blueprint Intergovernmental Agency began building a 10-foot multiuse trail along the north side of Tram Road in mid-December 2025, starting from the existing trail on Capital Circle and running to Four Oaks Boulevard.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and October to February. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Tallahassee, 7.9 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 64 68 74 80 87 91 92 92 89 82 72 66 Low °F 40 44 49 54 63 71 73 73 70 59 48 43 Precipitation, in 4.4 4.3 5.2 3.5 3.4 7.8 7.1 7.6 4.9 3.2 3.1 4.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1940 Tallahassee sheet (1:62,500); the 1943 Tallahassee sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/florida
Nearby trails
- Tallahassee-Saint Marks Historic Railroad State Trail within 0.2 mi · 21.0 mi, paved
- The Doctor Alpha Omega Campbell Connector Heritage Trail and Shared Use Path 1.6 mi away · 1.4 mi, paved
- Goose Pond Trail 1.9 mi away · 2.6 mi, paved
- Capital Cascades Trail 2.9 mi away · 2.6 mi, paved
- Miccosukee Greenway 4.2 mi away · 6.9 mi, dirt
- Stadium Drive Bike Trail 4.6 mi away · 0.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2117892, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Tram Road Multiuse Trail Project (Capital Circle Southeast to Four Oaks Boulevard) — City of Tallahassee · web · checked Oct 17, 2026 Supports: 10-foot multiuse trail on the north side of Tram Road from the existing Capital Circle trail system to Four Oaks Boulevard; construction began mid-December 2025; City of Tallahassee and Blueprint Intergovernmental Agency
- Capital Circle Southeast Trail — Visit Tallahassee · web · checked Oct 17, 2026 Supports: names Capital Circle Southeast Trail and Capital Circle Connector; 5.7 miles; concrete sidewalk widening to a 10-12 ft paved multi-use path; ends at the St. Marks Historic Railroad State Trail; benches and nearby parking; US 319 bike lane; Southwood Nature Trail and Lafayette Heritage Trail nearby
- Capital Circle Trail (relation 2117892) — OpenStreetMap · web · checked Oct 17, 2026 Supports: name; regional bicycle route tagged as a Capital Circle sidepath; mapped length of about 6 miles; extent from near Hill Lane to west of the St. Marks trail crossing
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.