States › Texas

Cargill Long Park Trail

Rail-trail in Texas · OpenStreetMap relation

Runs through Longview · Gregg County

Conditions now

Loading the weather near Longview…

Forecast by the National Weather Service for Longview · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.9 mi 4.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Hyacinth Drive mile 1.1 directions to trailhead 1
  2. Parking at Hollybrook Drive mile 2 directions to trailhead 2
  3. Parking at Hollybrook Drive mile 2 directions to trailhead 3
  4. Parking at North Eastman Road mile 2.1 directions to trailhead 4
  5. Parking at North Fourth Street mile 2.8 · restrooms · water directions to trailhead 5

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Longview, along the trail (opens in a new tab)
Longview, along the trail · Photo: Eaglegrafix at English Wikipedia · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Cargill Long Park Trail is a 3-mile rail-trail in Longview, in Gregg County, Texas, run by the Longview Parks and Recreation Department. It follows an old rail bed, the PB&IO Railroad line, along a wooded corridor among suburban neighborhoods and parks. The trail was built in 1972 on land donated by the Cargill family and was certified as a National Recreation Trail on June 1, 1972, the second trail in Texas to receive the designation; KETK has described it as the only National Recreation Trail in East Texas.

The northern end is at the Walnut Hills parking lot, 3112 North Fourth Street, and the trail runs south past Patterson Park, 1313 Hyacinth Drive, toward East Marshall Avenue. It is lighted between Fourth Street and Hollybrook Drive and has a pavilion, picnic tables, a playground, restrooms between Hughey Drive and Le Duke Boulevard, drinking fountains, benches and exercise stations. At its northern end it connects to the Guthrie Trail, which joins the Paul G. Boorman Trail, making a route of about 10 miles across the city.

The trail is open daily from 6 a.m. to 11 p.m. The Longview City Council approved a $1 million reconstruction of the trail; Parks and Recreation director Scott Caron said residents had asked to keep an asphalt surface, softer for running than concrete, and that a park system should offer a variety of trail surfaces. TrailLink lists the surface as asphalt and concrete. The record's map line measures about 2.9 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

60% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: January to March and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Longview #2, 0.8 km from the trail's middle, 36 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586271788592959690806860
Low °F364047546371747467564538
Precipitation, in4.24.3554.743.32.93.94.53.45.2
Snow, in0.10.70000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1956 Tyler sheet (1:250,000); the 1962 Longview Heights sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 20807786, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Walking Trails — Longview, TX · government source · checked Oct 15, 2026
    Supports: 3.0 miles, old rail bed, wooded corridor, hours 6 a.m. to 11 p.m., lighting between 4th Street and Hollybrook, amenities and restroom location, Parks and Recreation Department
  3. Cargill Long Park Trail — National Recreation Trails (American Trails) · organization · checked Oct 15, 2026
    Supports: built 1972 on land donated by the Cargills, second NRT in Texas, PB&IO Railroad line, certified June 1, 1972, Gregg County, Longview Parks and Recreation contact
  4. Longview City Council approves $1 million reconstruction of Cargill Long Trail — KETK · web · checked Oct 15, 2026
    Supports: $1 million reconstruction, asphalt rather than concrete at residents' request, Scott Caron quote, only NRT in East Texas
  5. Cargill Long Park Trail — TrailLink · web · checked Oct 15, 2026
    Supports: endpoints (Walnut Hills parking lot at 3112 N Fourth St and E Marshall Ave), Patterson Park parking at 1313 Hyacinth Dr, asphalt and concrete surfaces, connection to the Guthrie and Paul G. Boorman trails, 10-mile combined route

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.