Carolina Beach Island Greenway
Greenway in North Carolina
Runs through Carolina Beach · New Hanover County
Conditions now
Loading the weather near Carolina Beach…
Forecast by the National Weather Service for Carolina Beach · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South 8th Street mile 1.2 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Island Greenway is a paved multi-use path in Carolina Beach, North Carolina, part of what the town calls its Island Greenway System, a network of off-street trails, parks and scenic areas linked by designated bike and pedestrian routes on town streets. The town's greenway page also links to the East Coast Greenway.
The path runs about 1.2 miles from Mike Chappell Park south to the intersection of Alabama Avenue and Spot Lane, 10 feet wide, through woods in the buffer area of Military Ocean Terminal Sunny Point, which keeps ownership of the land. Town council approved the project in 2015 with a grant of $586,031 and a town match of $146,508. Construction began in 2018, when the project was expected to cost $1.1 million, and the path opened in March 2019, after six years of funding, planning and construction. It is open to bicycles and pedestrians only; motor vehicles, golf carts included, are barred, riders yield to pedestrians, and dogs must be leashed.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Southport 5 N, 9.9 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 60 62 68 76 82 88 92 90 86 79 70 63 Low °F 36 38 43 51 60 69 73 71 66 54 44 38 Precipitation, in 3.7 3.3 4 3.1 3.4 4 5.5 6.8 8.2 5.4 3.4 3.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1942 Wilmington sheet (1:62,500); the 1948 Wilmington sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Island Greenway — Town of Carolina Beach · government source · checked Oct 17, 2026 Supports: Island Greenway System as a network of off-street trails, parks and scenic areas linked by designated bike and pedestrian routes, link to the East Coast Greenway
- Island Greenway in Carolina Beach finally opens; Freeman Park temporarily closes — Port City Daily (March 14, 2019) · press · checked Oct 17, 2026 Supports: March 2019 opening, 1.2 miles, Mike Chappell Park to Alabama Avenue and Spot Lane, paved, 10 feet wide, wooded, six years from funding to construction, rules
- Town council approves island greenway on Carolina Beach — Port City Daily (March 17, 2015) · press · checked Oct 17, 2026 Supports: 2015 council approval, Military Ocean Terminal Sunny Point buffer area, $586,031 grant, $146,508 town match
- Island Greenway Project begins construction on Pleasure Island — Port City Daily (May 27, 2018) · press · checked Oct 17, 2026 Supports: 2018 construction start, $1.1 million expected cost, MOTSU retains ownership of the land
- Carolina Beach opens new 1.2-mile section of Island Greenway — WECT (March 2019) · web · checked Oct 17, 2026 Supports: opening, length, endpoints, width, bicycles and pedestrians only, golf carts prohibited
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.