Casey Jones State Trail
Rail-trail in Minnesota · OpenStreetMap relation
Runs through Gray Township, Burke Township, Woodstock, Chanarambie Township, The Lakes and Murray Township · Pipestone and Murray counties
Conditions now
Loading the weather near Lake Wilson…
Forecast by the National Weather Service for Lake Wilson · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Casey Jones State Trail is a multi-use recreational rail trail in southwestern Minnesota, USA. Although it was one of the first Minnesota state trails to be established, it remains incomplete as three discontinuous sections. The trail is managed by the Minnesota Department of Natural Resources. It traverses the rolling morainal landscape of the Coteau des Prairies, passing cropland interspersed with wooded ravines, remnant tallgrass prairie, and wetlands. The trail is named after railroad engineer Casey Jones, who famously sacrificed his life to lessen the severity of a 1900 train crash in Mississippi. Jones had no connections to Minnesota; the trail was named for him as it was the first abandoned railroad grade acquired by the state. The railroad was key to bringing settlers to the area in the late 19th century and for shipping their agricultural products to market.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Casey Jones State Trail mile 18.1 directions to Casey Jones State Trail
- Parking at 161st Street directions to trailhead 2
About this trail
The Casey Jones State Trail is a state trail in southwestern Minnesota made up of three separate segments, about 19 miles in all, managed by the Minnesota Department of Natural Resources. It was one of the first state trails authorized after Minnesota passed state trail legislation in the late 1960s, and it is named for the railroad engineer Casey Jones, who died in a train wreck in 1900; Jones had no connection to Minnesota, and the name was chosen because the corridor was the first abandoned railroad grade the state acquired. The planned route was to continue northeast through Slayton to Lake Shetek State Park, but no further land was bought, and only the section east from Pipestone was developed, opening in the mid-1970s. In 1993 Murray County secured federal funds for a paved loop between Currie and Lake Shetek State Park, completed in 1996. The 2002 Legislature made the loop part of the state trail and authorized a 30-mile extension, which was not funded.
The longest segment follows 12 miles of the former railroad grade east from Pipestone to the Pipestone-Murray county line. The 10 miles from Pipestone to Woodstock are paved, and the last 2 miles beyond Woodstock have an unmaintained natural surface. A second, natural-surface segment runs 1.5 miles west from Lake Wilson. The third is the 6-mile paved loop between Lake Shetek State Park and Currie, where the End-O-Line Railroad Park and Museum has parking and seasonal restrooms.
The trail passes cropland, wooded ravines, remnant tallgrass prairie, wetlands and the sloughs around Lake Shetek. Riders and carriage drivers need a horse pass, and horses are not allowed on the Currie loop. Snowmobiles must be registered, and in winter the trail connects with the area's grant-in-aid snowmobile trails. No other fees are charged, though parking in the state park requires a vehicle permit.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lake Wilson, 9.3 km from the trail's middle, 57 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 21 26 38 54 66 77 81 78 72 57 40 26 Low °F 4 8 20 32 45 56 60 57 48 35 22 10 Precipitation, in 0.6 0.9 1.6 3 4 5 3.6 3.4 3.2 2.3 1.7 0.8 Snow, in 7.8 10 9.2 5.1 0.3 0 0 0 0 0.8 4 9.1 - On the National Register
- Chicago, St. Paul, Minneapolis, and Omaha Turntable, Currie · structure, listed 1977 · nomination file for Chicago, St. Paul, Minneapolis, and Omaha Turntable
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Watertown sheet (1:250,000); the 1967 Woodstock sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 3066891, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Casey Jones State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q5048525, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Casey Jones State Trail — Minnesota DNR · government source · checked Oct 14, 2026 Supports: three segments; 12-mile former railroad grade from Pipestone to the Pipestone/Murray county line, 10 paved miles to Woodstock and 2 unmaintained natural miles; 1.5-mile natural segment west from Lake Wilson; 6-mile paved loop between Lake Shetek State Park and Currie; landscape; named for Casey Jones, died 1900; one of the first state trails authorized in the late 1960s; horse pass, no horses on the loop; snowmobile registration; GIA trail connection; parking at Pipestone, Woodstock, Lake Wilson, End-O-Line Railroad Park, Lake Shetek State Park; restrooms May through October at End-O-Line; state park vehicle permit; no other fees
- Casey Jones State Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: 19 miles, discontinuous; managed by the Minnesota DNR; named for Jones as the first abandoned railroad grade acquired by the state, Jones had no Minnesota connection; original route through Slayton to Lake Shetek State Park; only the Pipestone section developed, opening in the mid-1970s; 1993 federal funds secured by Murray County for the Currie loop, completed 1996; 2002 Legislature added the loop and authorized a 30-mile extension, funding not passed
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.