States › Kentucky

Cedar Brook Rails To Trails

Rail-trail in Kentucky

Runs through Lawrenceburg · Anderson County

Conditions now

Loading the weather near Lawrenceburg…

Forecast by the National Weather Service for Lawrenceburg · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.0 mi 1.6 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Industry Road mile 0 directions to trailhead 1
Lawrenceburg, along the trail (opens in a new tab)
Lawrenceburg, along the trail · Photo: Rob Alter · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Cedar Brook Rails to Trails is a gravel trail of about 1 mile on a former railroad line in Lawrenceburg, Anderson County, Kentucky. The Lawrenceburg/Anderson County Tourism Commission started the project in 2019, and in October of that year the Kentucky Department for Local Government selected the City of Lawrenceburg's YKK to Wild Turkey Rails to Trails project for $240,000 from the federally funded Recreational Trails Program, to convert a disused rail bed for use by pedestrians and cyclists. The line was the Southern Railroad's route into Anderson County, which distiller W.H. McBrayer helped bring to the area by donating land and financial support; he served as a director of the railroad until his death in 1888. The railroad ran from 1889 for about 100 years.

The 2019 plan called for a trail of about 2 miles from the YKK manufacturing plant, where the company agreed to provide land for parking, to the Wild Turkey distillery, with parking at the city's water treatment plant. The ties were to be removed and four inches of gravel laid for a trail 8 to 10 feet wide, with signs at the trailheads. Phase 1, about a mile long, was completed in June 2024; it crosses property bought by McBrayer Legacy Spirits for a future distillery.

In the middle of the planned route is the Cedar Brook Bridge, a viaduct about 800 feet long and 100 to 110 feet tall over Cedar Brook Road, which needs decking and handrails before it can carry the trail. Phase 2 would restore the bridge and connect the trail to the Wild Turkey Distillery; in September 2024 the city needed to raise $500,000 for the work, and McBrayer Legacy Spirits pledged part of the proceeds from a bourbon release toward it. The mapped trail has a fine-gravel surface and a trailhead on Industry Road.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Found On 1941 Anderson County Road Map (NS). From Abandoned Railroad in Kentucky (Kentucky Transportation Cabinet, CC0).

Shade

65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and June to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Versailles 3 NNW, 13 km from the trail's middle, 41 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414554657482848478675545
Low °F252835455462666457463629
Precipitation, in3.43.44.54.65.74.24.83.43.13.83.24
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1922 Frankfort sheet (1:48,000); the 1954 Tyrone sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Lawrenceburg Selected to Receive $240,000 Grant Award for Rails-to-Trails Project — Kentucky Department for Local Government (October 24, 2019) · government source · checked Oct 15, 2026
    Supports: $240,000 Recreational Trails Program grant, use by pedestrians and cyclists, planned 2-mile route from YKK to Wild Turkey, parking, tie removal, 4 inches of gravel, 8-10 foot width, trailhead signs, 800-foot, 100-foot-tall bridge needing decking and handrails
  3. McBrayer Legacy Spirits today announces release of Cedar Brook Wheated Bourbon — The Bourbon Flight (September 10, 2024) · web · checked Oct 15, 2026
    Supports: name Cedar Brook Rails to Trails, project started 2019 by the tourism commission, Phase 1 completed June 2024, about one mile, McBrayer Legacy Spirits property, Southern Railroad history and W.H. McBrayer's role, railroad ran from 1889 for about 100 years, 110-foot viaduct over Cedar Brook Road, Phase 2 and the $500,000 needed, bourbon proceeds pledge
  4. Way: Cedar Brook Rails To Trails — OpenStreetMap · web · checked Oct 15, 2026
    Supports: fine-gravel surface of the mapped trail; trailhead parking on Industry Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.