Cedar Creek Trail
Greenway in Oregon · OpenStreetMap relation
Runs through Sherwood · Washington County
Conditions now
Loading the weather near Sherwood…
Forecast by the National Weather Service for Sherwood · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by City of Sherwood.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Southwest Oregon Street mile 0 directions to trailhead 1
- Parking at Southwest Lincoln Street mile 0 directions to trailhead 2
- Parking at Southwest Oregon Street mile 0 directions to trailhead 3
- Parking at Southwest Oregon Street mile 0.1 directions to trailhead 4
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 5
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 6
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 7
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 8
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 9
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 10
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 11
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 12
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 13
- Parking at Southwest 1st Street mile 0.1 directions to trailhead 14
- Parking at Southwest Oak Street mile 0.2 · restrooms directions to trailhead 15
- Parking at Southwest 1st Street mile 0.2 directions to trailhead 16
- Parking at Southwest Washington Street mile 0.3 · restrooms directions to trailhead 17
- Parking at Southwest 1st Street mile 0.3 · restrooms directions to trailhead 18
- Parking at Southwest 1st Street mile 0.3 · restrooms directions to trailhead 19
- Parking at Southwest 1st Street mile 0.3 · restrooms directions to trailhead 20
- Parking at Southwest Pine Street mile 0.3 · restrooms directions to trailhead 21
- Parking at Southwest Pine Street mile 0.3 directions to trailhead 22
- Parking at Southwest Washington Street mile 0.6 · restrooms directions to trailhead 23
- Parking at Southwest Washington Street mile 0.6 directions to trailhead 24
- Parking at Southwest Sherwood Boulevard mile 0.8 directions to trailhead 25
- Parking at Southwest Sherwood Boulevard mile 0.8 directions to trailhead 26
- Parking at Southwest Sherwood Boulevard mile 0.9 directions to trailhead 27
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Cedar Creek Trail is a paved trail in Sherwood, Oregon, managed by the City of Sherwood. Segment A runs about 2 miles between Stella Olsen Park and Highway 99W at Meinecke Parkway, through the Cedar Creek greenway between Old Town and the highway. The city says the trail forms a good part of the West Fork of the Ice Age Tonquin Regional Trail System.
Construction was completed with a trail opening on September 16, 2022, and final acceptance on October 21, 2022. The lowest bid, awarded to Legacy Contracting, was $3,846,216.72. Work included a signalized ODOT crosswalk at Highway 99W, and the city restored fencing and landscaping along the visual corridor in a later phase completed in November 2024.
Two further segments are planned: Segment B, from Highway 99W to SW Edy Road, and Segment C, from SW Edy Road to SW Roy Rogers Road. Both are deemed feasible with design pending, and no construction funding is available. A tunnel under Highway 99W is under study at a cost estimate above $10 million. Sections southeast of Old Town are to be built with the SW Oregon Street improvements and development of the Tonquin Employment Area.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
N Willamette Exp Stn, 11.3 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 52 56 60 68 74 82 82 76 64 52 47 Low °F 36 37 39 42 47 52 56 55 51 45 39 36 Precipitation, in 6.1 4.2 4.9 3.3 2.4 1.6 0.5 0.5 1.7 4.3 6.2 6.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Tualatin sheet (1:62,500); the 1954 Sherwood sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesCedar Creek Trail System (City of Sherwood)
Nearby trails
- Tonquin Trail within 0.2 mi · 2.1 mi, paved
- River Terrace Trail 3.0 mi away · 1.9 mi, paved
- Westside Trail 3.1 mi away · 6.1 mi, paved
- Ice Age Tonquin Trail 3.6 mi away · 4.2 mi, paved
- Tualatin River Greenway Trail 3.6 mi away · 5.0 mi, paved
- Fanno Creek Trail 4.3 mi away · 8.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10275788, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Cedar Creek Trail System - City of Sherwood · government source · checked Oct 17, 2026 Supports: Segment A 2 miles, segments B and C status, Tonquin connection, tunnel, southeast sections
- Cedar Creek Trail Construction - City of Sherwood · government source · checked Oct 17, 2026 Supports: opening September 16, 2022, final acceptance, bid, crosswalk signal, restoration completed November 14, 2024
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.