States › Texas

Cedar Creek Waterway Trail

Greenway in Texas

Runs through Abilene · Taylor County

Conditions now

Loading the weather near Abilene…

Forecast by the National Weather Service for Abilene · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Cedar Creek Waterway Trail mile 0 directions to Cedar Creek Waterway Trail
  2. Cedar Creek Waterway Trail mile 1.9 directions to Cedar Creek Waterway Trail
West Texas Utilities Power Plant, beside the trail (opens in a new tab)
West Texas Utilities Power Plant, beside the trail · Photo: Larry D. Moore · CC BY 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Cedar Creek Waterway Trail is a concrete hike-and-bike trail along the east bank of Cedar Creek on the east side of Abilene, Texas, built by the City of Abilene. It is a creek greenway, not a rail-trail. The trail was Proposition 8 of the city's 2015 bond program, planned to follow the creek from South 11th Street to North 10th Street and to pass under the Union Pacific tracks that divide Abilene's north and south sides. It is the first built piece of a longer Cedar Creek Waterway plan: in 2013 the Abilene Christian University student newspaper described trails linking six city parks along the creek, from Kirby Lake Park north to Seabee Park, promoted by a nonprofit, Cedar Creek Waterway Development.

The city bought 16 acres for the corridor in December 2019 and 11 more from AEP Texas in May 2020, and Union Pacific granted a pedestrian underpass agreement in October 2020. That month the city council hired Freese and Nichols to design the trail for $270,700. In August 2022 the council took up a construction contract with Bontke Brothers Construction, putting the project's total cost at $2,348,580, drawn from remaining 2015 bond money and the city's Minor Improvement Fund. The state accessibility registry lists construction from June 2022 to a March 2023 estimated completion, with its inspection complete.

The bid documents describe about 1.9 miles of concrete trail of varying widths from East South 11th Street to East North 10th Street, with three trailheads, a small parking area, bike racks, water fountains, picnic stations, pedestrian security beacons and interpretive signs. The trail crosses Lytle Creek at a low-water crossing and passes beneath a Union Pacific trestle just north of the confluence of Cedar and Lytle creeks, where a canopy shields users from falling debris. This record maps about 1.9 miles, with parking at both ends.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and October to January. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Abilene Regional Airport, 5.6 km from the trail's middle, 33 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F596371798693969689796859
Low °F343745536270737265554335
Precipitation, in1.11.31.71.93.23.41.92.52.72.81.41.3
Snow, in0.710.10.30000000.70.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Abilene sheet (1:125,000); the 1957 Abilene East sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Cedar Creek Trail Development, project TABS2022017293 — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: City of Abilene as owner; trail development along the eastern bank of Cedar Creek with parking, amenities and trailheads; start 6/1/2022, completion 3/30/2023; status Inspection Complete; Freese and Nichols design firm
  3. Abilene's Cedar Creek Trail still in the works — KTXS (March 14, 2018) · web · checked Oct 15, 2026
    Supports: Proposition 8 of the 2015 City of Abilene bond program; South 11th Street to North 10th Street; passes under the railroad tracks that divide Abilene's north and south sections
  4. Abilene City Council approves a design company for the Cedar Creek Waterway Project — KTXS (October 23, 2020) · web · checked Oct 15, 2026
    Supports: $270,700 design contract with Freese and Nichols, Inc.; project part of the 2015 bond
  5. Abilene city council considers $4+ million in upgrades for parks, waterway trails — KTAB/KRBC BigCountryHomepage (August 22, 2022) · web · checked Oct 15, 2026
    Supports: contract with Bontke Brothers Construction; total $2,348,580 from 2015 bond allocations and the Minor Improvement Fund; 16 acres purchased December 2019; 11 acres from AEP Texas May 2020; Union Pacific pedestrian underpass agreement October 2020; designed 2017, East South 11th to East North 10th
  6. Creek project to link city parks — The Optimist, Abilene Christian University (March 2013) · web · checked Oct 15, 2026
    Supports: Cedar Creek Waterway plan linking six Abilene parks with trails from Kirby Lake Park to Seabee Park; nonprofit Cedar Creek Waterway Development
  7. Cedar Creek Trail Development — ConstructConnect (bid notice) · web · checked Oct 15, 2026
    Supports: about 1.9 miles of concrete trail of varying widths, eastern bank, E.S. 11th Street to E.N. 10th Street; three trailheads; small parking area, bike stands, water fountains, picnic stations, pedestrian security beacons, interpretive signage; low-water crossing of Lytle Creek; canopy under the Union Pacific trestle north of the Cedar and Lytle confluence
  8. Cedar Creek Waterway Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: trail name; mapped length of about 1.9 miles; parking at both ends

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.