Center Street Trail
Greenway in Utah
Runs through North Salt Lake and Goshen · Davis and Utah counties
Conditions now
Loading the weather near Goshen…
Forecast by the National Weather Service for Goshen · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 100 South restrooms directions to trailhead 1
- Parking at Center Street directions to trailhead 2
(opens in a new tab) About this trail
The Center Street Trail mapped here joins two separate paved paths in Utah that share a name in OpenStreetMap: one along Center Street in North Salt Lake, Davis County, and one along Center Street in Goshen, Utah County, about 60 miles to the south. The two are not connected, and together they total about 1.4 miles.
The North Salt Lake section, about 1 mile long, is mapped in OpenStreetMap as an asphalt bike path open to walkers, running east-west beside West Center Street and crossing Redwood Road, where it meets the Redwood Road Trail. No page from North Salt Lake or Davis County naming this path was found, so its manager and history are not given here.
The Goshen section, about half a mile long, runs north-south beside Center Street past Goshen Elementary School. The engineering firm Parametrix describes it as a multi-use trail it designed for the Utah Department of Transportation, built to improve pedestrian safety and give students a route to the school, with two new rectangular rapid flashing beacon crossings; the Mountainland Association of Governments funded it. OpenStreetMap shows those beacon crossings on the path, and a parking area with restrooms on 100 South near its north end.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Salt Lake City International Airport, 7.4 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 45 55 62 73 84 94 92 81 66 51 39 Low °F 24 29 36 42 50 59 68 67 56 44 33 25 Precipitation, in 1.4 1.3 1.8 2.2 1.8 0.9 0.5 0.6 1.1 1.3 1.3 1.4 Snow, in 12.7 10.7 5.9 2.9 0.1 0 0 0 0 0.5 7 12.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1885 Salt Lake sheet (1:250,000); the 1951 Salt Lake City North sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Redwood Road Trail within 0.2 mi · 1.3 mi, paved
- Golden Spoke Trail Network within 0.2 mi · 74.1 mi, paved
- Jordan River Parkway Trail 0.4 mi away · 47.6 mi, paved
- Denver and Rio Grande Western Rail Trail 3.7 mi away · 23.7 mi, paved
- Airport Trail 4.9 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Goshen Center Street Trail - Parametrix · web · checked Oct 17, 2026 Supports: Goshen multi-use trail along Center Street, designed for UDOT, pedestrian safety, connection to Goshen Elementary School, two RRFB crossings, Mountainland Association of Governments funding
- OpenStreetMap ways named Center Street Trail (North Salt Lake way 1311156415; Goshen ways such as 1548228010) — OpenStreetMap · web · checked Oct 17, 2026 Supports: the name of both sections, cycleway tagging with foot access, asphalt and paved surface, locations along Center Street in North Salt Lake and Goshen, meeting with the Redwood Road Trail, RRFB-marked crossings in Goshen, Goshen Elementary location, parking with restrooms on 100 South
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.