States › Iowa

Prairie Land Trail

Rail-trail in Iowa · OpenStreetMap relation

Runs through Burchinal and Swaledale · Cerro Gordo County

Conditions now

Loading the weather near Burchinal…

Forecast by the National Weather Service for Burchinal · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
13.5 mi 21.7 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Prairie Land Trail drawn on the 1954 USGS topographic map of Mason City, Iowa
Then: the 1954 USGS Mason City sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The trail mapped here as the Cerro Gordo County Trail is the developed part of the Prairie Land Trail, a rail trail run by Cerro Gordo County Conservation in north-central Iowa. The full corridor is 21 miles long and follows an abandoned railroad bed from Nettle Avenue southwest of Mason City to Apple Avenue southwest of Meservey. The Iowa Department of Transportation acquired it from the Union Pacific Railroad, partly by purchase and partly by donation; the corridor is held under the federal statutes for interim recreational use of rail beds, and the department agreed to transfer ownership to the county for recreational development.

The county has opened the trail in stages. By late 2019 it ran 6 miles on the former Union Pacific bed from just south of Mason City to 190th Street south of Burchinal, and the county was surfacing 2 more miles to 170th Street and modifying two bridges, for about 8 of the planned 21 miles; further sections were to follow as funding allowed. The open trail now runs about 13.6 miles from 240th Street near Mason City, where the trailhead is at 13773 240th Street, south through Swaledale to 1st Street South in Thornton. Parking is available at 10365 150th Street in Swaledale and in a small lot at the Thornton end, and the corridor can also be reached where it crosses rural county roads.

The surface is compacted crushed limestone. The trail crosses open farmland, with rural views and prairie wildflowers in summer. Plans call for developing the rest of the corridor toward Meservey and connecting the trail with Mason City's own trail network.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former Union Pacific line, built 1886, abandoned 2005. From Iowa DOT Rail Line Abandoned (CC BY 4.0).

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mason City Municipal Airport, 14.4 km from the trail's middle, 24 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F242842587080828074604430
Low °F71124344757605849372414
Precipitation, in0.91.22.34.25.25.44.43.83.52.51.71.3
Snow, in11.310730.300000.439.4
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Mason City sheet (1:250,000); the 1957 Mason City sheet (1:250,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12728049, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Prairie Land Trail — Conservation — Cerro Gordo County, Iowa · government source · checked Oct 15, 2026
    Supports: 21-mile recreational corridor on an abandoned railroad bed from Apple Ave SW of Meservey to Nettle Ave SW of Mason City; rural landscapes and summer prairie wildflowers; access where it crosses rural county roads; acquired by IDOT as a partial acquisition/donation from the Union Pacific Railroad; federal interim recreational use statutes; IDOT agreement to transfer ownership to the county; trailhead at 13773 240th St
  3. Prairie Land Trail expanding in Cerro Gordo Co — BikeIowa (December 2, 2019) · web · checked Oct 15, 2026
    Supports: 6 miles open from just south of Mason City to 190th Street south of Burchinal on a former Union Pacific bed with compacted lime chip; Cerro Gordo County Conservation developing 2 more miles to 170th Street and modifying two bridges; about 8 of 21 miles; county line at Meservey; more sections as funding allows
  4. Prairie Land Trail — TrailLink · web · checked Oct 15, 2026
    Supports: 13.6 miles between 240th Street in Mason City and 1st Street S in Thornton; crushed limestone; farmland; plans to develop the rest of the 21-mile corridor and connect with Mason City's trails; parking at 10365 150th Street in Swaledale and a small lot at the southern end in Thornton

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.